- 17 -
2-4. Service Position
2-5. G Board Removal
To remove the G Board first remove the PFC bracket by
removing the two fixing screws (one on each side of the
bracket) and lifting away from the G board.
Remove the screw from the centre of the G board, release
the clips circled and ease the board gently away from the
support bracket.
To place the chassis in the service position, remove the D2
bracket (see 2-7.) and locate on the beznet inside the set.
Insert the main bracket firmly into the T-slot located on the left
corner of the beznet as indicated (see inset). To gain access to
the underside of the boards follow the instructions on page 19.
[Removal and Replacement of the main bracket bottom plates].
Clips
2-6. D2 Board Removal
To remove the D2 board remove the two screws circled,
release the clips circled and ease the board gently away from
the support bracket.
Screws
Clips
Screw
2-7. D1 Board Removal
To remove the D1 board first remove the D2 bracket by
removing the three screws from the bracket (one on opposite
side) and releasing the four clips (two on each side of the
bracket). The D1 board can then be removed using the
same method as the G board.
Screws
Clips
Summary of Contents for KV-36FS76U
Page 107: ......