GDM-F500R
2-3. G BOARD REMOVAL
2-4. A BOARD, I/O TERMINAL BOARD ASSEMBLY REMOVAL
2-2
Three screws
(+ BVTT 4 x 8)
Two hooks
CN654
CN653
CN652
CN601
CN603
CN650
Open the G block in the direction
of the arrow . and remove of
the arrow .
A
B
A
B
2
1
Four screws
(+BVTP 3 x 8)
G shield
G board
GND
CN602
GND
Two printed circuit board holders
6
Two screws
(+ BVTP 3 x 8)
7
AC inlet (3P)
8
3
4
5
GND
GND
A board (2/2)
Three screws
(+BVTT 4 x 8)
1
Screw (M4)
(EXT TOOTH Washer)
2
Two screws
(HD15)
5
I/O Terminal board assembly
6
4
A board (1/2)
A board (1/2)
A board (1/2)
Screw lock
3
When installing terminal
bracket, be sure to apply
screw lock on 2 spots after
screws (HD15) are fixed.