
— 11 —
CPD-4201M
2-3. D, A, H and N BOARD REMOVAL
2-1. CABINET REMOVAL
2-2. SERVICE POSITION
SECTION 2
DISASSEMBLY
1
2
3
A board
H board
(additional board)
D board
rotate 180º
Cable bracket
Two Cable stoppers
Five screws
(BVTP 3 x 12)
D board
One screw
(BVTT 4 x 8)
1
4
5
7
3
8
Holder
10
A board
Two screws
(BVTP 3 x 12)
6
N board
2
H board
9
Cabinet
1
3
2
Two screws
(BVTP 4 x 16)
Two claws
PUSH
PUSH
1 When the D-board is
placed in service
position, the Safety Earth
Wire (green and yellow
wire) is disconnected.
2 After service is
completed and the
D-board reinstalled, the
Safety Earth Wire must
be reattached to the
chassis with the proper
screw. This must be
confirmed before any
subsequent procedures
are attempted.
Summary of Contents for CPD-4201M
Page 17: ... 17 CPD 4201M NOTES ...
Page 18: ... 18 CPD 4201M NOTES ...
Page 25: ......
Page 28: ......
Page 48: ...CPD 4201M 53 NOTES ...
Page 49: ...CPD 4201M 54 NOTES ...
Page 50: ...English 98LS74015 1 Printed in U S A 1998 12 9 978 847 01 ...