38
KDL-32XBR4/40D3000
KDL-32XBR4/40D3000
KDL-32XBR4 ONLY
1. Route 40P LVDS Cable between
BU-Bd and TCON as shown.
2. Apply 3x8mm Screw (2-places) to ground
LVDS cable.
Put Attention on Routing of Cable.
G1 to BU cables are on TOP of LVDS.
H3-Bd cables are UNDER LVDS.
3mm TORQUE: 6.0kg-cm (+-1.0kg-cm)
OPERATION PROCESS
TORQUE SPECIFICATION
NOTE: LVDS Cable is OVER ALL cables
Apply 3X8mm screw
when installing DTT Shield Top
1
2
2
Apply 3X8mm screw
when installing BH Shield Top
CAUTION:
NOTE COLOR OF TAPE ON LVDS HARNESS!
PROPER COLOR IS WHITE.
*LVDS HAS 2 GROUNDING TABS!
Not used in final design
LVDS CABLE - BH BOARD TO TCON