Working Instruction
,
Mechanical
3/000 21-1/FEA 209 544/115 C
Company Internal
©
Sony Ericsson Mobile Communications AB
44(64)
3.20 Dome Sheet Array
REMOVAL
Follow the 2.1.1– 2.1.5 Disassembly instructions!
Use the tweezers to peel off the
dome sheet array
from the
PBA
.
INSTALLATION
Clean the
PBA
surface with isopropyl alcohol.
Make sure that the two guiding holes on the
PBA
correspond to the two holes on the
dome sheet array
,
when attaching the new
dome sheet array
,
in a proper way.
Follow the 4.2.4 – 4.2.8 Reassembly instructions!