Commissioning and maintenance
Start-up by turning all ball valves to the operating posi-
tion. Close all flushing and filling valves and turn caps.
Setting the volume flow.
For further information see separate manual and
Pressure loss and residual delivery
head
PSKR18
PSKR18HE / PSKR18HE-O
Pump PM2 15-105
Residual delivery head
PSKR18HE (-O)
Pump Solar 15-65
Residual delivery head
PSKR18