4 | Switching on the storage system
14 / 28
Operating instructions sonnenBatterie hybrid 9.53
4 Switching on the storage system
4.1 Switching on the PV disconnector SPV
The external PV disconnector switch establishes the connection between the PV system
and the inverter of the storage system.
Switch on the PV disconnector switch.
4.2 Switching on the fuse switch F1
NOTICE
If the storage system can’t be switched on:
Do not attempt switching on the storage system more than three times.
Contact the service!
ð
Further attempts can damage the battery modules.
Fuse switch F1 establishes the connection between the battery and the inverter.
Illustration 3: Fuse switch F1 at the top side of
the storage system
Switch on fuse switch F1.
The storage system then starts up and performs a self-test. Once the self-test is success-
ful, the storage system is ready to operate.
When the storage system is in normal operation, the sonnen Eclipse pulses white (see
Function of the sonnen Eclipse [P. 13]).
4.3 Switching on the grid voltage
Switch on the grid voltage using the AC miniature circuit breaker.