Sonnen Protect 1300-AU-IN-ATS Operating Instructions Manual Download Page 3

 
 
 

 

 

1 Information about this document 

 
This document describes the operation of the sonnenProtect 1300-AU-IN-ATS accessory in connection with a 
backup load sub-board supplied and connected by the installer in conjunction with the sonnenBatterie eco 9.43 
storage system containing a minimum of 7.5kW (x3 battery modules) or greater storage capacity. 
 

 Read this document in its entirety before beginning the installation work. 

 Keep this document in the vicinity of the sonnenBatterie. 

 

1.1 Target group of this document 

This document is intended for the operator of the storage system and the sonnenProtect. 
 

1.2 Designations in this document 

The following designations are used in this document: 
 

complete designation   

 

 

designation in this document 

sonnenBatterie eco 9.43  

 

 

storage system 

sonnenProtect 1300-AU-IN-ATS  

 

sonnenProtect 

 

1.3 Explanation of symbols 

Extremely dangerous situation leading to certain death or serious injury 
if the safety information is not observed. 
  
Dangerous  situation  leading  to  potential  death  or  serious  injury  if  the 
safety information is not observed. 
 
Dangerous situation leading to potential injury if the safety information 
is not observed. 
   
Indicates actions that may cause material damage. Important information 
not associated with any risks to people or property. 
 
Symbol Meaning 
 

 Work step 

1. 2. 3. 

 

 

 

 

 

Summary of Contents for Protect 1300-AU-IN-ATS

Page 1: ...Operating instructions sonnenProtect 1300 AU IN ATS KD AUD0420 Art Nr 130003 Version X01 support sonnen com au www sonnen com au...

Page 2: ...he product environment 5 2 5 Voltage inside the sonnenProtect accessories 5 3 Product description 6 3 1 Technical data 6 3 2 System components 7 4 Function 7 4 1 Basic principle 7 4 2 Grid operation n...

Page 3: ...the storage system and the sonnenProtect 1 2 Designations in this document The following designations are used in this document complete designation designation in this document sonnenBatterie eco 9...

Page 4: ...f the sonnenProtect must not be connected to the building mains Only connect an electrical consumer that does not exceed the nominal power in continuous operation and maximum power when switched on of...

Page 5: ...otect and the storage system must be wired in accordance with the product documentation The number of plug outputs on the sonnenProtect must not be changed All repairs on the sonnenProtect must be per...

Page 6: ...ed Switchover time approx 15 seconds Safety Minimum Protection Standard IEC 61009 1 AS NZ 61009 1 Required Protective functions Overcurrent Earth Leakage required Degree of protection Specified by ins...

Page 7: ...echnical data 4 2 Grid operation no grid outage If the public electricity grid is not experiencing an outage the backup load circuits connected to the sonnenProtect backup supply will be continuously...

Page 8: ...switched on Do not attempt to switch on the storage system more than three times Contact the sonnen support Australia Further attempts can damage the battery modules Fuse switch F1 establishes the con...

Page 9: ...ecking function Maintenance interval Action to be taken Every 6 months Check the function of the insulation monitor with help of the Test key see 3 2 6 2 Cleaning Risk of material damage due to use of...

Page 10: ...system The RCD and or overall power from the sonnenBatterie is switching off immediately or after the sonnenProtect has been operating for a longer period An electrical consumer with a power consumpti...

Page 11: ...tect Danger to life due to electrocution The sonnenProtect must only be uninstalled by authorized electricians 8 1 2 Disposal The sonnenProtect must not be disposed of as domestic waste Dispose of the...

Page 12: ...12 www sonnen com au www sonnensupport com au...

Reviews: