Sonel MIC-2505 Operating Manual Download Page 8

OPERATING MANUAL MIC-2505 version 1.01 

1  Safety 

 

 

MIC-2505 meter is designed for performing check tests of protection against electric shock 

in mains systems. The meter is used for making measurements and providing results to determine 

safety of electrical installations. Therefore, in order to provide conditions for correct operation and the 

correctness of the obtained results, the following recommendations must be observed: 

  Before you proceed to operate the meter, acquaint yourself thoroughly with the present manual 

and observe the safety regulations and specifications determined by the producer. 

  Any application that differs from those specified in the present manual may result in a damage to 

the device and constitute a source of danger for the user. 

  MIC-2505 meters must be operated only by appropriately qualified personnel with relevant certifi-

cates authorising the personnel to perform works on electric systems. Operating the meter by un-

authorised personnel may result in damage to the device and constitute a source of danger for the 

user. 

  During measurements of insulation resistance, dangerous voltage up to 2.5 kV occurs at the ends 

of test leads of the meter. 

  Before the measurement of insulation resistance you must be sure that  tested object is discon-

nected from the power supply. 

  During the measurement of insulation resistance do not disconnect test leads from the tested ob-

ject before the measurement is completed (see par. 3.1); otherwise the capacitance of the object 

will not be discharged, creating the risk of electric shock. 

  The instrument must not be used for the mains and equipment in rooms with special conditions, 

such as fire or explosion hazard. 

  It is unacceptable to operate the following: 

  a damaged meter which is completely or partially out of order, 

  a meter with damaged test leads insulation,

 

  a meter stored for an excessive period of time in disadvantageous conditions (e.g. excessive 

humidity). If the meter has been transferred from a cool to a warm environment with a high 

level of relative humidity, do not start measurements until the meter is warmed up to the am-

bient temperature (approximately 30 minutes).

 

  Displayed 

BATT

 symbol indicates insufficient voltage of power supply and the need to charge the 

accumulator or replace batteries. 

  Symbols 

Err

X

, where 

X

 is a number 1…9, indicate incorrect operation of the meter. If after restart-

ing the device this situation is repeated - it indicates that the meter is damaged. 

  If after switching ON and displaying software version, message 

 is displayed and the meter 

switches OFF - send the meter for servicing. When 

 is displayed every time after the meter is 

switched ON, but the meter enters the measurement mode – update its software. 

  Before measurement, choose a correct measurement function and make sure that test leads are 

connected to respective measuring terminals. 

  Do not operate a meter with an open or incorrectly closed battery (accumulator) compartment or 

power it from other sources than those specified in the present manual. 

 

R

ISO

 inputs are electronically protected against overloads (caused by e.g. connecting the meter to 

a live circuit) up to 600 V for 60 sec.          

  Repairs may be carried out only by an authorised service point. 

 

 

 

Note: 

Due to continuous development of the meter’s software, the actual appearance of the display, 

in case of some of the functions, may slightly differ from the display presented in this operat-

ing manual. 

 

 

Summary of Contents for MIC-2505

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ...OPERATING MANUAL INSULATION RESISTANCE METER MIC 2505 SONEL SA ul Wokulskiego 11 58 100 widnica Version 1 01 17 02 2012...

Page 6: ...ersion 1 01 2 MIC 2505 meter is a modern easy in use and safe measuring device Please acquaint yourself with the present manual in order to avoid measuring errors and prevent possible problems related...

Page 7: ...ER SUPPLY 13 5 1 MONITORING OF THE POWER SUPPLY VOLTAGE 13 5 2 REPLACING RECHARGEABLE BATTERIES 13 5 3 CHARGING RECHARGEABLE BATTERIES 13 5 4 GENERAL PRINCIPLES REGARDING USING NIMH RECHARGEABLE BATTE...

Page 8: ...ipment in rooms with special conditions such as fire or explosion hazard It is unacceptable to operate the following a damaged meter which is completely or partially out of order a meter with damaged...

Page 9: ...ETUP button pressed Use and buttons to set the auto off time or cancel auto off function horizontal lines Press SEL button to enter the setting of no minal network frequency Use and buttons to set the...

Page 10: ...IC 2505 version 1 01 6 Use and to set Ab1 Ab2 parameters or PI DAR Press ENTER to display the measurement screen approving introduced changes or press ESC to go to the measurement scre en without vali...

Page 11: ...each other and the probe crocodile clips because such a contact may cause the flow of surface currents resulting in additional error in measu rement results Set the rotary switch of function selection...

Page 12: ...pressed a triangle with an exclamation mark will be displayed in dicating about automatic measurement now the buttons may be released In or der to interrupt the measurement press START or ESC View of...

Page 13: ...UISO voltage is stabilized Symbol LIMIT means operation with limited converter current If this condition persists for 20 se conds the measurement is interrupted If the timer reaches characteristic po...

Page 14: ...measurement when voltage previously reached the nominal value LED is lit in red two tone acoustic signal During the measurement AC voltage appeared or the ob ject cannot be discharged for 30 seconds...

Page 15: ...ors of the cable at taching to G terminal other conductors that do not take part in the measurement 3 3 Voltage measurement Set the rotary switch of function selection at U position Connect the meter...

Page 16: ...eter LED is lit in red two tone acoustic si gnal Voltage is higher than acceptable Immediately disconnect the test leads 4 Software updates Turn on the meter holding ENTER and SETUP buttons de pressed...

Page 17: ...ighter socket using an optional charger WARNING If the test leads are left in the terminals during replacement of the batteries the re is a risk of electric shock with a dangerous voltage To replace t...

Page 18: ...aximum capacity after being formatted 2 3 charge discharge cycles The most important factor which influ ences the lifetime of rechargeable batteries is the level of their discharge The deeper the disc...

Page 19: ...case of storage of the device the following recommendations must be observed Disconnect all the test leads from the meter Clean the meter and all its accessories thoroughly In the case the meter is to...

Page 20: ...um values of the measured resistance depending on the test voltage are presented in the table below For other voltages the range limits may be read from the chart below Voltage Test range 500V 500G 10...

Page 21: ...non standard condi tions and for metrological laboratories for the purpose of calibration Significant parameter Designation Additional uncertainty Position E1 0 Supply voltage E2 0 BAT is not lit Temp...

Page 22: ...cat IV 1000V WAPRZ005REBB5K 5kV lead 5m red with banana plugs WAPRZ005BUBB5K 5kV lead 5m blue terminated with ba nana plugs WAPRZLAD12SAM Cable for charging the accumulator package from the car cigare...

Page 23: ...urer of the device and provider of warranty and post warranty service SONEL S A ul Wokulskiego 11 58 100 widnica Poland tel 48 74 858 38 60 fax 64 74 858 38 09 E mail export sonel pl Web page www sone...

Page 24: ...OPERATING MANUAL MIC 2505 version 1 01 20...

Page 25: ......

Page 26: ......

Reviews: