
MAINTENANCE AND CARE
Page 18
9
Maintenance and care
9.1
Maintenance schedule
Machine part
Work to be performed
Interval
Overall machine
Check the on/off switch function
In every shift
Check for orderly condition and cleanliness of the
machine. If necessary, clean the machine.
In every shift
Check function.
In every shift
Check all screws and tighten as needed.
Weekly
Electrical equipment
Check the electrical equipment. Replace damaged
switches/cables immediately.
Every six months/
as needed
V-belt
Check the tension, retension.
Initally after 10-20 h
Every 3-6 months
Check for damage/wear.
Every 3-6 months
Pinch rollers
Remove foreign bodies from the pinch rollers.
As required
Hopper/run-in grille/magnets
Remove foreign bodies (e.g. straw).
Remove metal objects from the magnets.
As required
Depends greatly on
the material to be
crushed.
Protective grilles and safety
covers
Clean grilles.
As required
NOTE
Do not clean with running water!
Do not clean the machine with running water (e.g., water hose, pressure cleaner).