
10
Step 5
Connection of electrical and signal cables through the profiles
Before continuing the installation, all electrical and signal cables
MUST
be connected and tested.
All these processes has to be performed on the pedestals on the ground.
Before beginning the testing, chapter C in the installation instructions must be read.
Connection of cable connections is carried out when the frames are not screwed together.
Blades motor unit and LED lights, are preset in the factory. ZIP rolo is not preset in the factory. Preset of the ZIP rolo
should be done by installer.
After completing the installation, the metal constructions must be grounded.
Connecting cables
Position (1)
Cable for drive unit
è
plug and socket AG
Cables for LED lights on the blades
è
plug
and socket AF
Cable for ZIP rolo
è
plug and socket AH
Position (2)
Cables for LED lights on the blades
è
plug
and socket AF
Drive unit
Connect plug and socket on AG joint
(1)
AG, AF, AH
(L1)
(W1)
(2)
AF
AG
P1
P2
P3
P4
(W2
)
Summary of Contents for Pergola Agava SL 160/28
Page 2: ...2 ...
Page 4: ...4 A TOOLS EQUIPMENT 8 6 Ø10 10 13 17 Ø12 ...
Page 23: ...23 DANGER Hazard of crushing hands or limbs ...
Page 24: ...24 D OPTIONS Sliding glass panel ...
Page 36: ...36 ...