SOLIS S5-GC100K Installation And Operation Manual Download Page 34

.66.

11. Appendix

11.1 Grid standard selection guide

For different countries and regions, corresponding grid code needs to be selected in the 

inverter LCD to meet the requirements of local network provider. 

This instruction indicates how to change the grid code and what code should be selected in 

different places.

This following list illustrates the grid standard options in the inverter which are subject to 

change. It is for your reference only. If customer has any doubts or uncertainty, please 

consult Solis service department for confirmation.

To set the correct grid code, please enter the following path:

Advanced Settings -> Password:0010 -> Select Standard

Detailed protection limits can be viewed when choosing the code. 

Please select "Save&Send" to enforce the code.

NOTE: 

Please check if the grid code setting comply with local requirement.

NO.

1

2

3

4

5

6

7

8

9

10

11

12

Code in LCD

VDE4015 

EN50549 PO

EN50549 NL

EN50438 L

France

C10/11

NRS097

CEI0-21

G98

G99

Country/Region

Germany

Poland

Netherland

France

Belgium

South Africa

Italy

UK

UK

Comments

For German Low Voltage Grid.

For Polish Low Voltage Grid

For Dutch Low Voltage Grid

General EN50438 Requirement. 

Possible to be used in Austria, Cyprus, Finland, 

Czech Republic, Slovenia, etc.

For French Low Voltage Grid

For Belgian Low Voltage Grid

For South African Low Voltage Grid

For Italian Low Voltage Grid

For UK Low Voltage Grid  <16A

For UK Low Voltage Grid  >16A

-

-

EIFS- SW

Sweden

For Swedish Low Voltage Grid

EN50549L

(EN50549-1)

General EN50549-1 requirement which meets 
local requirements of most European countries

.67.

13

14

15

G98 NI

G99 NI

User-define

North Ireland

North Ireland

For North Ireland Low Voltage Grid  <16A

For North Ireland Low Voltage Grid  >16A

Customized Protection Limits

16

Gen50 

Gen 60

DK1

Generator Connected, Frequency-Derating, 50Hz

Generator Connected, Frequency-Derating, 60Hz

For East Danish low voltage grid

-

-

-

17

18

East Denmark

NO.

Code in LCD

Country/Region

Comments

DK2

50438IE

RD1699

EN50549

For West Danish low voltage grid

For Irish low voltage grid

For Spanish low voltage grid

General EN50549 Requirement. 

Possible to be used in Cyprus, Finland, 

Czech Republic, Slovenia,Jamaica

19

20

21

22

West Denmark

Ireland

Spain

-

11. Appendix

Summary of Contents for S5-GC100K

Page 1: ...Binhai Industrial Park Xiangshan Ningbo Zhejiang 315712 P R China Tel 86 0 574 6578 1806 Fax 86 0 574 6578 1606 If you encounter any problem on the inverter please find out the inverter S N and conta...

Page 2: ...onfiguration 32 6 Start and Shutdown 6 1 Start up procedure 6 2 Shutdown procedure 33 33 33 7 1 Main Menu 34 34 7 2 Information 4 1 RS485 and PLC communication connection 26 7 Normal operation 34 4 2...

Page 3: ...ribution grid This manual covers the three phase inverter model listed below Solis 100K 5G Solis 110K 5G Solis 125K HV 5G HV S5 GC100K S5 GC110K S5 GC125K Solis 50K LV 5G Solis 60K LV 5G S5 GC50K LV S...

Page 4: ...nal box to repackage the inverter seal with adhesive tape with the desiccant inside the box Store the inverter in a clean and dry place free of dust and dirt The storage temperature must be between 40...

Page 5: ...RNING Risk of fire Despite careful construction electrical devices can cause fires Do not install the inverter in areas containing highly flammable materials or gases Do not install the inverter in po...

Page 6: ...erminals communication waterproof connectors to prevent the cables from sagging and causing the waterproof connectors to loosen Tilt angle 15 Ground clearance 300mm 3 1 2 Installation environment requ...

Page 7: ...d vertically The steps to mount the inverter are listed below 1 Refer to Figure 3 6 drill holes for mounting screws based on the hole diameter of bracket using a precision drill keeping the drill perp...

Page 8: ...from vertical Figure 3 10 Wrong installation Angle The steps to mounted to the rack are listed below 3 Install mounting plate 1 Remove the bracket and fasteners from the packaging Mark the position f...

Page 9: ...OFF 2 Switch the DC Isolator OFF 3 Connect the inverter to the grid 4 Assemble PV connector and connect to the Inverter Inverter design uses PV style quick connect terminal The top cover needn t be o...

Page 10: ...nding 2 Prepare OT terminals M10 To effectively protect the inverter two grounding methods must be performed Connect the AC grounding cable Please refer to section 3 4 3 Connect the external grounding...

Page 11: ...MAKE SURE the polarity of the PV array output conductors matches the DC and DC terminal labels before connecting these conductors to the terminals of the inverter 5 Measure PV voltage of DC input wit...

Page 12: ...s Table 3 2 Rating of grid OCPD 3 4 3 1 Connecting the inverter to the utility grid All electrical installations must be carried out in accordance with the local standards and the National Electrical...

Page 13: ...terminal block The torque is 10 20Nm Figure 3 27 Wiring with Neutral Solis 100 110 K 5G Solis 50 60 K LV 5G S5 GC 100 110 K S5 GC 50 60 K LV Figure 3 28 Wiring without Neutral Solis 125K HV 5G S5 GC1...

Page 14: ...tween PLC communication and RS485 communication can be realized by flipping the switch on the communication board as indicated in figure 4 2 Only one communication method is available during operating...

Page 15: ...ard be verified for the country of installation before commissioning The menu for changing the grid standard or for creating a custom standard is accessible as described in Section 6 7 and below WARNI...

Page 16: ...d by the inverter see Specifications in section 10 may damage the inverter Although Solis inverters feature reverse polarity protection prolonged connection in reverse polarity may damage these protec...

Page 17: ...ed DC POWER LED and LCD will be continuously lit 4 Solis inverters are powered from the DC side When the inverter detects DC power that is within start up and operating ranges the inverter will turn o...

Page 18: ...verter App_Power Shows the apparent power of the inverter Work Mode Volt watt DRM NO 08 10 sec 10 sec Work Mode Shows current working mode DRM NO Shows DRM Number I_DC01 Shows input 01 current value I...

Page 19: ...1 Alarm Message 2 Running message 3 Version 4 Daily Energy 5 Monthly Energy 6 Yearly Energy 7 Daily Records 8 Communication Data 9 Warning Message The following submenus are displayed when the Settin...

Page 20: ...history of changing settings Only for maintance personel 7 Normal operation 7 Normal operation 7 4 3 Version The screen shows the model version of the inverter And the screen will show the software v...

Page 21: ...1 1S Startup T 10 600S OV G F1 50 2 53Hz 60 2 63Hz OV G F1 T 0 1 9S OV G F2 51 53Hz 61 63Hz OV G F2 T 0 1 9S UN G F1 47 49 5Hz 57 59 5Hz UN G F1 T 0 1 9S UN G F2 47 59Hz 57 59Hz UN G F2 T 0 1 9S Resto...

Page 22: ...DOWN key to move the cursor Press the UP key to revise the value Press the ENTER key to execute the setting Press the ESC key to return to the previous menu 7 5 4 Reset Password This function is used...

Page 23: ...r the switch is open the inverter HMI will display Limit by DRM and the inverter output power will be limited to zero 1 Select Initial Settings 2 Select DRM and set it ON 7 5 10 HMI Update HMI Current...

Page 24: ...l operation 7 Normal operation Figure 7 25 Selecting Fan Test displays the sub menu shown below Are you sure YES ENT NO ESC Fan Test is a factory test function Press the ENTER key to start the test Pr...

Page 25: ...Normal operation Solis Three Phase Inverter does not require any regular maintenance However cleaning the dust on heat sink will help the inverter to dissipate the heat and increase its life time The...

Page 26: ...all the time Can not start up 1 Check if the connector on main board or power board are fixed 2 Check if the DSP connector to power board are fixed 1 Check inverter surrounding ventilation 2 Check if...

Page 27: ...he PV string current down below 0 5A Turn off the two DC switchs and fix the polarity issue Screen OFF with DC applied Inverter internally damaged 1 Do not turn off the DC switches as it will damage t...

Page 28: ...rtz 45 55 or 55 65 2W Noise emission typical 65 dBA Intelligent redundant cooling Dimensions W H D Weight 1065 567 344 5mm 84kg Max DC input voltage Volts MPPT voltage range Volts Max input current Am...

Page 29: ...nge Hertz 45 55 or 55 65 2W Noise emission typical 65 dBA Intelligent redundant cooling Dimensions W H D Weight 1065 567 344 5mm 84kg Max DC input voltage Volts MPPT voltage range Volts Max input curr...

Page 30: ...5 2W Noise emission typical 65 dBA Intelligent redundant cooling Dimensions W H D Weight 84kg Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings n...

Page 31: ...ntelligent redundant cooling IEC 61727 IEC 62116 C10 11 VDE 4105 IEEE 1547 Dimensions W H D Weight 84kg Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input...

Page 32: ...IEC 61727 IEC 62116 C10 11 VDE 4105 IEEE 1547 Dimensions W H D Weight 84kg Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT number Max input strings number Rated grid v...

Page 33: ...45 55 or 55 65 0 99 0 8 leading 0 8 lagging Noise emission typical 65 dBA Dimensions W H D Weight 1065 567 344 5mm 84kg Max DC input voltage Volts MPPT voltage range Volts Max input current Amps MPPT...

Page 34: ...nce Belgium South Africa Italy UK UK Comments For German Low Voltage Grid For Polish Low Voltage Grid For Dutch Low Voltage Grid General EN50438 Requirement Possible to be used in Austria Cyprus Finla...

Reviews: