background image

.

4 7 .

.

4 6 .

7 .

  N

o rm al

  o p erat i o n

7 .

  N

o rm al

  o p erat i o n

Fi g

u

re  7 .

2 5

Sel

ect i n g

  “Fan   Test ”  di sp l

ays  t h

e  su

b

-m en u   sh

o w

n   b

el

o w

:

A re

 

yo u

 

su

re

?

Y E

S

=

<

E

N

T

>

 

N

O

=

<

E

SC

>

Fan   Test   i s  a  f act o ry  t est   f u

n ct i o n .

 

P ress  t h

e  E

N

TE

R   k

ey  t o  st art   t h

e  t est .

 

P ress  t h

e  E

SC   k

ey  t o  r

et u

r

n   t o  t h

e  p rev i o u

s  m en u

.

7 .

5 .

1 5  D

SP  Up dat e

Th

e  f u

n ct i o n   i s  u

sed  f o r

  u

p dat e  t h

e  D

SP.

Th

i s  f u

n ct i o n   i s  ap p l

i cab

l

e  b

y  m ai n t en an ce  p er

so n n el

  o n l

y,  w

r

o n g

  o p er

at i o n  

w

i l

l

  p r

ev en t   t h

e  i n v ert er

  f

ro m   reach

i n g

  m ax

i m u

m   p o w

er

.

7 .

5 .

1 6  C o m p en sat i o n   Set

Th

e

 

screen

 

sh

o w

s

:

Fi g

u

re  7 .

2 6  P o w

er

  R at e  Li m i t

P ress  t h

e  D

o w

n   k

ey  t o  m o v e  t h

e  cu

rso r

.

P ress  t h

e  Up  k

ey  t o  ch

an g

e  t h

e  di g

i t

.

P l

ease  p ress  t h

e  E

n t er

  t o  sav e  t h

e  set t i n g

  an d  p ress  t h

e  E

SC   k

ey  t o  ret u

rn   t o  t h

e  p rev i o u

m en u

.

Th

i s  set t i n g

  i s  u

sed  f o r

  g

ri d  o p er

at o r

s,  do  n o t   ch

an g

e  t h

i s  set t i n g

  u

n l

ess 

sp eci f i cal

l

y  i n st ru

ct ed  t o .

Th

i s  f u

n ct i o n   i s  u

sed  t o  cal

i b

rat e  i n v er

t er

  o u

t p u

t   en er

g

y  an d  v o l

t ag

e.

  I

t   w

i l

l

  n o t   i m p act   t h

en erg

y  co u

n t   f o r

  i n v ert er

  w

i t h

  R G M .

 

Tw

o  sect i o n s  are  i n cl

u

ded:

  P o w

er

  P aram et er

  an d  Vo l

t ag

e  P aram et er

.

Y E

S=

< E

N

T>   N

O =

< E

SC >

P o w

er

 

p ar

a

:

1

.

0 0 0

7 .

5 .

1 3  D

eb

u

g

  P aram et er

Fi g

u

re  7 .

2 4

D

eb

u

g

 

P aram et er

  as    sh

o w

n     as  b

el

o w

:

 

Th

i s  sect i o n   i s  ap p l

i cab

l

e  t o  m ai n t en an ce  p erso n n el

  o n l

y.

Pr

ess  t h

e  UP/ D

O W

N

  k

eys  t o  scr

ol

l

  t h

r

ou

g

h

  i t em s.

  P r

ess  t h

e  E

N

TE

R   k

ey  t o  sel

ect

.

Pr

ess  t h

e  D

O W

N

  k

ey    t o  scr

ol

l

  an d  pr

ess  t h

e  UP  k

ey  t o  ch

an g

e  t h

e  val

u

e.

 

Pr

ess  t h

e  E

N

TE

R   k

ey  t o  save  t h

e  set t i n g

.

  Pr

ess  t h

e  E

SC   k

ey  t o  can cel

.

ch

an g

es  an d  r

et u

r

n   t o  t h

e  pr

evi ou

s  m en u

.

S1 6 D

A T1 :

  + 0 0 0 0

S1 6 D

A T2 :

  + 0 0 0 0

7 .

5 .

1 2   R est art   H M I

Th

e

f u

n ct i o n

i s

u

sed

f o r

r

est art

t h

e

H M I

.

Th

i s  f u

n ct i o n   i s  ap p l

i cab

l

e  b

y  m ai n t en an ce  p er

so n n el

  o n l

y,  w

ro n g

  o p erat i o n  

w

i l

l

  p r

ev en t   t h

e  i n v ert er

  f

ro m   reach

i n g

  m ax

i m u

m   p o w

er

.

7 .

5 .

1 1   E

x

t ern al

  E

P M   Set

Fi g

u

re  7 .

2 3  Set   t h

e

 

Fai l

 

Saf e  O N

/ O FF

Y E

S=

< E

N

T>     N

O =

< E

SC >

Fai l

 

Saf e  Set :

O N

Th

i s  f u

n ct i o n   i s  t u

r

n ed  o n   w

h

en   t h

e  E

P M   i s  ex

t ern al

.

7 .

5 .

1 4    FA N

  Test

Th

i s  sect i o n   i s  ap p l

i cab

l

e  t o  m ai n t en an ce  p er

so n n el

  o n l

y.

Summary of Contents for 100K-5G-AU

Page 1: ...stri alPark Xi ang sh an N i ng b o Zh ej i ang 31 571 2 P R C h i na Tel 86 0 574 6578 1 80 6 Fax 86 0 574 6578 1 60 6 I f you encou nterany prob l em on th e i nverter pl ease f i nd ou t th e i nve...

Page 2: ...ed u r e 6 2 Sh u tdow n procedu re 34 34 34 7 1 M a i n M en u 35 35 7 2 I n f o r m a t i o n 4 1 R S485 and PLC com m u ni cati on connecti on 2 6 7 N orm aloperati on 35 4 2 D R E D port connecti...

Page 3: ...i ng Brack et N u m b er 1 1 Hex ag on b ol t M 6 1 2 R em ark s 3 4 5 Fasteni ng screw 2 D C connector Userm anu al 2 0 1 1 2 3 4 AC Sw i tch o p ti o n a l 5 M anu al O N O FF D C SW I TC H O N O FF...

Page 4: ...ag e th e i nver ter sealw i th adh esi ve tape w i th th e desi ccant i nsi de th e b ox Stor e th e i nver teri n a cl ean and dr y pl ace f r ee of du st and di r t Th e stor ag e tem per atu r e m...

Page 5: ...spi te caref u lconstru cti on el ectri caldevi ces can cau se f i res D o not i nstal lth e i nverteri n areas contai ni ng h i g h l y f l am m ab l e m ateri al s or g ases D o not i nstal lth e i...

Page 6: ...e sou nd l evelf rom th e i nvertercan b e q u i te h i g h 3 2 Produ ct h andl i ng Fi g u re 3 3 Handl es u sed to m ove th e i nvertersh ow n ci rcl ed i n red 3 1 2 4 Ai rci rcu l ati on D o not i...

Page 7: ...l y Th e steps to m ou nt th e i nverterare l i sted b el ow 1 R ef erto Fi g u re 3 6 dri l lh ol es f orm ou nti ng screw s b ased on th e h ol e di am eterof b rack et u si ng a preci si on dri l l...

Page 8: ...Fi g u re 3 1 0 W rong i nstal l ati on Ang l e Th e steps to m ou nted to th e rack are l i sted b el ow 3 I nstal lm ou nti ng pl ate 1 R em ove th e b rack et and f asteners f rom th e pack ag i ng...

Page 9: ...2 Sw i tch th e D C I sol atorO FF 3 C onnect th e i nverterto th e g ri d 4 Assem b l e PV connectorand connect to th e I nverter I nverterdesi g n u ses PV styl e q u i ck connect term i nal Th e to...

Page 10: ...term i nal s M 1 0 To ef f ecti vel y protect th e i nverter tw o g rou ndi ng m eth ods m u st b e perf orm ed C onnect th e AC g rou ndi ng cab l e Pl ease ref erto secti on 3 4 3 C onnect th e ex t...

Page 11: ...h e D C and D C term i nall ab el s b ef ore connecti ng th ese condu ctors to th e term i nal s of th e i nverter 5 M easu re PV vol tag e of D C i npu t w i th m u l ti m eter veri f y D C i npu t c...

Page 12: ...ce m u st b e u sed b etw een th e i nverterand th e g ri d N O TE Use AL C U transf er b i m etal l i c term i naloranti ox i dant g rease w i th al u m i nu m cab l es and term i nal s Tab l e 3 2 R...

Page 13: ...i nalb l ock Th e torq u e i s 1 0 2 0 N m C ab l e speci f i cati on 70 38 56 45 C opper cored cab l e C ab l e ou terdi am eter m m Traverse cross secti onalarea m m 2 R ang e R ecom m ended 35 1 85...

Page 14: ...d connecti on pl ease ref erto 4 2 secti on I nverter PV Stri ng s I nverter PV Stri ng s I nverter PV Stri ng s I nverter PV Stri ng s G ri d Transf orm er PLC C C O D atal og g er D C AC PLC R S485...

Page 15: ...t to R J45 pl u g C or r espondenc e b et w een t he c ab l es and t he st i t c hes of pl u g Pi n 1 w h i te and orang e Pi n 2 orang e Pi n 3 w hi t e a nd green Pi n 4 b l u e Pi n 5 w h i te and...

Page 16: ...l th ou g h th e g ri d standard i s set at th e f actory i t i s essenti alth e g ri d standard b e veri f i ed f orth e cou ntry of i nstal l ati on b ef ore com m i ssi oni ng Th e m enu f orch ang...

Page 17: ...pol ari ty m ay dam ag e th ese protecti on ci rcu i ts and orth e i nverter 5 4 3 2 Leak ag e to g rou nd M easu re l eak ag e to g rou nd to ch eck f ora D C g rou nd f au l t 5 4 3 2 1 D etecti on...

Page 18: ...detects D C pow erth at i s w i th i n start u p and operati ng rang es th e i nverterw i l ltu rn on Af tertu rn on th e i nverterw i l lch eck i nternalparam eters sense and m oni torAC vol tag e h...

Page 19: ...I _D C 0 2 0 4 9A I _D C 2 0 0 5 2 A VPV_Total Sh ow s i npu t vol tag e total I PV_Total Sh ow s i npu t cu rrent total Tab l e 7 1 I nf orm ati on l i st Statu s G enerati ng Pow er 1 488W G ri d F...

Page 20: ...i x ed 7 4 2 R u nni ng M essag e Th i s f u ncti on i s f orm ai ntai nce person to g et ru nni ng m essag e su ch as i nternaltem peratu re Standard N o 1 2 etc Screens can b e scrol l ed m anu al l...

Page 21: ...or User D ef Usi ng th i s f u ncti on th e l i m i ts can b e ch ang ed m anu al l y Th ese vol tag e val u es are th e ph ase vol tag e Th e di spl ay sh ow s th e l atest w arn m essag es see Fi g...

Page 22: ...earE nerg y C l earE nerg y can reset th e h i story yi el d of i nverter Th ese tw o f u ncti ons are appl i cab l e b y m ai ntenance personnelonl y w rong operati on w i l lprevent th e i nverterf...

Page 23: ...i m u m pow er 7 5 6 C al i b rate E nerg y M ai ntenance orrepl acem ent cou l d cl earorcau se a di f f erent val u e of totalenerg y Use th i s f u ncti on cou l d al l ow u serto revi se th e val...

Page 24: ...rou tpu t energ y and vol tag e I t w i l lnot i m pact th e energ y cou nt f ori nverterw i th R G M Tw o secti ons are i ncl u ded Pow erParam eterand Vol tag e Param eter YE S E N T N O E SC Pow er...

Page 25: ...to th orou g h l y i nspect th e D C ci rcu i t to ensu re al lt h e cab l es are correctl y f astened O nce th e D C ci rcu i t i ssu e h as b een f i x ed ori t i s conf i rm ed to b e O K press E S...

Page 26: ...Th e du st can b e rem oved w i th a sof t b ru sh 8 1 Anti PI D Fu ncti on Sol i s Th ree ph ase I nverters i nteg rates opti onalAnti PI D m odu l e and i t can recover th e PI D ef f ect du ri ng n...

Page 27: ...i rem ents Bef ore del i veri ng to th e cu stom er th e i nverterh as b een su b j ected to severaltests to ensu re i ts opti m aloperati on and rel i ab i l i ty I n case of f ai l u re th e LC D sc...

Page 28: ...M PPTnu m b er M axi npu t stri ng s nu m b er R ated g ri d vol tag e Vol ts R ated g ri d ou tpu t cu rrent Am ps Pow erFactor at rated ou tpu t pow er M ax ef f i ci ency E U ef f i ci ency M odel...

Page 29: ...1 0 9 1 2 E N 61 0 0 0 6 2 4 A S N ZS4777 2 I E C 62 1 1 6 I E C 61 72 7 I E C 60 0 68 I E C 61 683 E N 50 530 D i m ensi ons W H D W ei g h t 84k g M ax D C i npu t vol tag e Vol ts M PPTvol tag e ra...

Reviews: