Manual SQV Acoustic Housing
Page 19
Version: 08/2018
7.2
Installation of Heat
Pump, Air Conditioning and
Refrigeration outdoor unit
The correct installation position of the
air conditioning, refrigeration or heat
pump unit is decisive for the fit and
function of the acoustic housing.
Important Notice! For different
manufacturers of the installed
refrigeration, air conditioning and heat
pump outdoor unit, the ESP setting
must be adjusted manually on the PCB
so that the fan runs with a high static
pressure. Please contact the
refrigeration, air conditioning and heat
pump outdoor unit manufacturer for
more detailed information.
8.
Maintenance and Service
8.1
General
For maintenance and service work on
the refrigeration, air-conditioning or
heat pump unit, the necessary panels
can be easily removed from the
acoustic housing.
Cleaning and maintenance of the
acoustic housing
•
Remove other dirt with a damp
cloth; if necessary, use grease-
or oil-dissolving detergents
(concentrated neutral detergent
with pH between 8 and 9).
•
Treat galvanized parts with
preservation spray.
•
Regularly lubricate moving parts
such as panel locks with a
lubrication spray.
•
Regularly treat seals.
•
Repair any damage to the
coating, including areas that
show signs of corrosion, with
repair paint.
•
Clean the unit thoroughly to
remove all construction dust and
other dirt.
•
Prior to shipping, each unit is
carefully inspected at our factory.
8.2
Silencers
The sound insulation material of the
silencers should be checked for dust
during major maintenance work and, if
necessary, cleaned with a vacuum
cleaner.
If necessary, the silencers must be
checked for free passage, as this is
necessary for perfect air circulation
and the function of the installed
refrigeration, air conditioning or heat
pump unit.
8.3
Grounding
Depending on the local regulations
and position, we recommend to
carry out a grounding or lightning
protection.
8.4
Test run
After working on the acoustic housing,
the person responsible must ensure
that no persons are in the acoustic
housing before it is put into operation
again.
8.5
Removal and disposal
Metal parts and plastic parts are to be
recycled, per applicable regulations.
Summary of Contents for SonaSafe SQV
Page 1: ...MANUAL SQV SERIE ENGLISH Version 08 2018 Please read carefully and keep for future reference ...
Page 11: ...Manual SQV Acoustic Housing Page 11 Version 08 2018 ...
Page 13: ...Manual SQV Acoustic Housing Page 13 Version 08 2018 ...
Page 15: ...Manual SQV Acoustic Housing Page 15 Version 08 2018 ...