9
WINTERIZING
In areas where the pool and the equipment is winterized (equipment drained and pool covered), Precision should
be winterized also. This is done by removing the entire Precision manifold from the plumbing and storing in a
warm, dry place.
First, blow out all pipes with air while the Precision is still installed on the pipe. Then:
A.
Unplug the lamp in reverse order of inserting it as shown on page 6.
B.
Coil the wire around the power supply which is mounted to the wall and slide up off of mounting bracket.
C.
Unthread the union nuts and remove the entire manifold from the pipe and store safely inside.
D.
Cover opening in pipes with red caps provided. Secure caps with a little duct tape.
A
System On
(Flashing - No Flow)
Check Manual
or Our Website
www.solaxx.com
D
Close openings with
red caps provided
Remove and store
MAINTENANCE
System On
(Flashing - No Flow)
Check Manual
or Our Website
www.solaxx.com
PRECISION
PRECISION
C
PRECISION
PRECISION
AUTOMATIC
REGULATOR
FLOW
PRECISION
PRECISION
Slide Power supply up
off of mounting bracket
and store.
B
FLOW
FLOW