background image

9

WINTERIZING

In areas where the pool and the equipment is winterized (equipment drained and pool covered), Precision should 

be winterized also.  This is done by removing the entire Precision manifold from the plumbing and storing in a 
warm, dry place.

First, blow out all pipes with air while the Precision is still installed on the pipe.  Then:
A. 

Unplug the lamp in reverse order of inserting it as shown on page 6.

B. 

Coil the wire around the power supply which is mounted to the wall and slide up off of mounting bracket. 

C. 

Unthread the union nuts and remove the entire manifold from the pipe and store safely inside.

D. 

Cover opening in pipes with red caps provided.  Secure caps with a little duct tape.

A

System On 
(Flashing - No Flow)

Check Manual 
or Our Website

www.solaxx.com

D

Close openings with

red caps provided

Remove and store

MAINTENANCE

System On 
(Flashing - No Flow)

Check Manual 
or Our Website

www.solaxx.com

PRECISION

PRECISION

C

PRECISION

PRECISION

AUTOMATIC

REGULATOR

FLOW

PRECISION

PRECISION

Slide Power supply up 
off of mounting bracket 
and store.

B

FLOW

FLOW

Summary of Contents for Precision UV

Page 1: ...Installation and Operating Instructions PRECISION PRECISION www solaxx com PRECISION PRECISION AUTOMATIC REGULATOR FLOW...

Page 2: ...nit WARNING ELECTRICSHOCK DisconnectallACpowerduringinstallationorperforminganyservicework CAUTION Topreventpossible reorelectricalshock useonlyreplacementlampspeci edbythemanufacturer CAUTION Donotus...

Page 3: ...e quality of drinking water A microscopic residual of chlorine 5 1 0 ppm is recommended for use with this system as a supplemental source of disinfection For best results the pool pump should run at l...

Page 4: ...ally diverted into the UV chamber at the proper ow rates Restriction to the plumbing is nominal when the manifold is inserted into the plumbing and is comparable to adding a heater to the pool See bel...

Page 5: ...LHEALTH A Unthread and remove the end cap with the wire attached from the end of the UV chamber by rst loosening the small black plastic nut then the larger black nut to pull out plug B Pull gently un...

Page 6: ...ing power supply 2 Mount the aluminum bracket rst on a vertical surface at a height of approximately ve 5 feet above the ground using the screws provided with the spacers against wall to allow air ow...

Page 7: ...2 inch UL514B 5 Wires 6 Items 3 4 5 Not supplied INSTALLATION 1 2 3 4 5 Ground L1 L2 Line Pump Power Supply Box 240V Install Ground L1 N Line Pump Power Supply Box 110V Install Wires to be connected t...

Page 8: ...IELD A DEFECTIVE OR NON FUNCTIONING POWER SUPPLY IS REPLACED WITHANEW UNIT ONLY Steady Blue LED system has power and is operating normally Flashing Blue LED no ow to chamber This could be caused by th...

Page 9: ...the power supply which is mounted to the wall and slide up off of mounting bracket C Unthread the union nuts and remove the entire manifold from the pipe and store safely inside D Cover opening in pi...

Page 10: ...TTING OILS FROM HANDS ON THE LAMP SKIN OILS ATTACH TO THE LAMP AND SHORTEN ITS EFFECTIVE LIFE IF LAMPISTOUCHED WIPE CLEAN WITHASOFTCLOTHAND RUBBINGALCOHOL CLEANING THE QUARTZ SLEEVE The quartz sleeve...

Page 11: ...n any respect including but not limited to the use of parts other than genuine manufacturer parts If this System is installed for use on non residential pools or pools bigger than 35 000 gallons this...

Page 12: ...MAN6000 12 17 PRECISION PRECISION www solaxx com...

Reviews: