background image

614.

X1-Hybrid Series
User Manual

3.0 kW - 7.5 kW

EN

The copyright of this manual belongs to SolaX Power Network Technology(Zhejiang) Co., Ltd. Any 
corporation or individual should not plagiarize, partially or fully copy (including software, etc.), and 
no reproduction or distribution of it in any form or by any means. All rights reserved. SolaX Power 
Network Technology (Zhejiang) Co., Ltd. reserves the right of fnal interpretation. The contents are 
subject to change without prior notice.

SolaX Power Network Technology (Zhejiang) Co,. Ltd.

Add.: No. 288 Shizhu Road, Tonglu Economic Development Zone, Tonglu 

City, Zhejiang Province, China 311500

Tel.: +86 571-56260011
E-mail: [email protected]

Copyright © SolaX Power Technology (Zhejiang) Co., Ltd. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means 
without prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. (hereinafter 

Summary of Contents for X1-Hybrid

Page 1: ...opment Zone Tonglu City Zhejiang Province China 311500 Tel 86 571 56260011 E mail info solaxpower com Copyright SolaX Power Technology Zhejiang Co Ltd All rights reserved No part of this document may...

Page 2: ...3 2 AC Output Input 20 3 3 Battery 21 3 4 E ciency Safety and Protection 21 3 5 EPS O grid Output 22 3 6 General Data 22 4 Installation 23 4 1 Check for Transport Damage 23 4 2 Packing List 23 4 3 Ins...

Page 3: ...ment as described below Danger Danger refers to a dangerous situation that if not avoided will result in a high level of risk such as serious injury or even death Warning Warning indicates a hazardous...

Page 4: ...erter can not be operated when it is running Strictly follow relevant safety specifications for product installation and testing During installation operation or maintenance please read carefully and...

Page 5: ...tovoltaic string array is lower than the maximum rated DC input voltage of the inverter Any damage caused by photovoltaic over voltage is not covered by warranty Installation position should be away f...

Page 6: ...ng Effect High leakage Current Earth connection essential before connecting supply A faulty ground connection can result in equipment failure personal and death injuries and electromagnetic interferen...

Page 7: ...lines UKNI mark The inverter complies with the requirements of the applicable UKNI guidelines The inverter can not be disposed together with the household waste Disposal information can be found in th...

Page 8: ...ulations when installing operating and maintaining the inverter otherwise it will cause personal injury or death and the inverter will cause damage Please read the manual carefully when operating the...

Page 9: ...Neutral line and PE line are combined together all loads connect to the EPS Off grid port Apply to Australia Notice When power cuts suddenly the inverter connects the N line of EPS Off grid load with...

Page 10: ...e for areas with frequent power outages Same working logic with Self use mode This mode will maintain the battery capacity at a relatively high level to ensure that the emergency loads can be used whe...

Page 11: ...port Communications LCD is a reserved port DRM Port only for Australia USB port for upgrading External monitoring connection port Description Battery communication port Ground connection port Waterpro...

Page 12: ...Output Input apply to version D M Max recommended PV power W Max DC voltage V Nominal DC operating voltage V MPPT voltage range V MPPT full power voltage range V Max input current A Max short circuit...

Page 13: ...24 24 482 417 181 590 530 315 28 28 28 120 rated 1h X1 Hybrid 6 0 6000 26 1 X1 Hybrid 6 0 24 28 X1 Hybrid 7 5 X1 Hybrid 7 5 7500 32 6 100 rated 120 rated 1h 120 rated 1h 120 rated 10min 25 29 Smart Co...

Page 14: ...ature of the installation site is 35 60 C C The maximum angle range of wall tilt 5 Avoid direct sunlight rain and snow weather 1 A B C D E F G H I J K 1 1 4 4 3 3 1 1 Description L M 1 2 6 mm European...

Page 15: ...Image Hammer drill Socket wrench set Hexagon Torque screwdriver Name Image Utility knife Diagonal pliers Multifunction terminal crimping tool RJ45 Multimeter Marker Tape measure Protective glasses Du...

Page 16: ...tem Please be careful not to install the inverter in the plasterboard wall or similar to the residential places with poor sound insulation so as not to work with noise and interfere with the residents...

Page 17: ...ket Tapping screws Bracket a Draw drilling holes as per the bracket s hole locations by a marker and ensure that the two top holes lie on the same straight line by spirit level b Drill holes at marked...

Page 18: ...rid G4 X1 Hybrid G4 X1 Hybrid G4 e Hang the buckle on the inverter to the corresponding position of the backplane f Use the inner hexagonal wrench to tighten the inner hexagonal X1 Hybrid G4 series in...

Page 19: ...igure 1 make sure all wires are inserted into the metal terminal see Figure 2 The PV port wiring of the X1 Hybrid G4 M series inverter has been completed and it can be used directly with the PV port o...

Page 20: ...X1 Hybrid 7 5 D X1 Hybrid 7 5 M 8 10 mm 40 A 5 2 Grid Port and EPS O grid Output Connection X1 Hybrid 3 0 M X1 Hybrid 3 7 M X1 Hybrid 5 0 M X1 Hybrid 6 0 M X1 Hybrid 7 5 M 4 6 mm 4 6 mm Cable copper M...

Page 21: ...puts go through the Grid port and when the grid is disconnected the inverter outputs go through the EPS Off grid port The EPS Off grid function can be connected to part of the load and it can also be...

Page 22: ...n please refer to X1 Matebox If you need to buy X1 Matebox please contact us In full load scheme Diagram B and Diagram D set Matebox to Enable under Settings The Australian customer must shorten the N...

Page 23: ...nally use crimping pliers to press tightly Notice Check the grid voltage and compare the voltage range see technical data Disconnect the circuit board from all power sources to prevent electric shock...

Page 24: ...trical Connection Electrical Connection Torque screwdriver Torque 1 5 0 1 N m GRID EPS Off grid L N PE L N 44 45 Upgrade Dongle Step 4 Find the location of the AC interface on the inverter insert the...

Page 25: ...Battery Connection ON OFF PV 1 PV 2 BAT BMS CAN DRM Meter CT COM LCD Battery port connection line of the X1 Hybrid G4 M series inverter is on the X1 Matebox just connect it It is necessary to wire th...

Page 26: ...EMP GND BMS_CANL 2 3 4 5 6 7 8 1 PIN X BMS_485A BMS_485B Electrical Connection Electrical Connection Definition 48 49 Step 4 Press down on the spring by hand you can hear a click sound then push the e...

Page 27: ...le Increase power generation subject to constraints from other active DRMs For AS4777 DRM function currently only PIN6 DRM0 and PIN1 DRM1 5 are functional other PIN functions are under development X1...

Page 28: ...int at the public grid Other power generation equipment The current sensor measures the current on the live wire between the inverter and the public grid To select CT you need to enter Use setting the...

Page 29: ...here are only PIN6 DRM0 and PIN1 DRM1 5 and other PIN functions are under development Application occasion 5 5 3 COM Communication Data Read External communication equipment controls the inverter COM...

Page 30: ...ns The communication protocol is Modbus RTU For details please contact SolaX If the user wants to use the inverter dry contact to control external equipment such as a heat pump it can be used with Sol...

Page 31: ...d as follow 1 2 3 4 5 6 7 8 METER CT communication cable 1 8 1 2 3 4 5 6 7 8 485A 485B X CT1 2 CT1 1 CT2 2 CT2 1 X A B Notice Only one of the Meter and CT connections can be selected Meter cable goes...

Page 32: ...Waterproof connector with RJ45 is inserted into the inverter and one side of the RJ45 terminal is inserted into the CT connection Notice When installing pay attention to water resistance All the conne...

Page 33: ...inal and then clamp it Step 3 Insert the stripped cable into OT terminal and tighten the terminal with a terminal crimping tool Hexagon keys Torque 1 5 0 2N m Upgrade Dongle Upgrade Dongle Upgrade Don...

Page 34: ...Upgrade Step 1 First find the DONGLE port of the inverter The inverter provides a DONGLE port which can transmit data of the inverter to the monitoring website via Pocket WiFi Plus Pocket 4G Pocket G...

Page 35: ...al Remove the locking screw from the DC switch Turn on the DC switch between the PV string and the X1 Hybrid G4 if there is any Turn on the DC switch at the bottom of the X1 Hybrid G4 When the photovo...

Page 36: ...than 20 or the battery input voltage is greater than 90 V Otherwise it may cause serious failure during the upgrade process If the ARM firmware upgrade fails or stops please do not unplug the U disk...

Page 37: ...U disk according to the following path Step 1 Please save the Upgrade firmware in your U disk first and press the Enter button on the inverter screen for 5 seconds to enter the OFF mode Step 2 Find t...

Page 38: ...d working normally Green flashing The battery communication is normal and in an idle state O The battery does not communicate with the inverter Red light on The inverter is in a fault state O The inve...

Page 39: ...it Main Breaker Limit Battery Heating EPS Setting Charger External ATS Parallel Setting ShutDown MicroGrid PV Connection AS4777 Setting Advance Password The main interface is the default interface the...

Page 40: ...d PV Battery Grid Load Without PV power Active Charging time period The grid supplies the loads and also can charge the battery PV 0 Grid Load Battery Active Discharge time period The battery will pow...

Page 41: ...th frequent power outages Same working logic with Self use mode This mode will maintain the battery capacity at a relatively high level Users setting to ensure that the emergency loads can be used whe...

Page 42: ...r CT 1 Meter CT 2 On grid Error Log The history data contains five pieces of information on grid power of the inverter EPS power generation power of the meter CT and error logs Press up and down to se...

Page 43: ...ay 00 0KWh Meter CT 1 c Meter CT 1 Here you can see the inverter electricity sold total electricity sold electricity bought from the grid and total electricity bought on Output Today 00 0KWh Meter CT...

Page 44: ...the reserved minimum SOC of the battery capacity to 10 which means that when the battery has been discharged to 10 of the battery capacity the battery is not allowed to continue to discharge When Char...

Page 45: ...side to charge the battery and set the amount of power to charge the battery For example set the reserved minimum SOC of the battery capacity to 30 which means that when the battery has been discharge...

Page 46: ...ill grant the setting permissions to its installers and distributors Region Australia A Australia B Australia C New Zealand Standarad Code Name AS4777_2020_A AS4777_2020_B AS4777_2020_C New Zealand Se...

Page 47: ...er needs to select the CT or electricity meter to connect the inverter here Select the address of the meter CT does not need to select the address In the Meter CT Settings box there are two options Ne...

Page 48: ...r Mode Select Over Excited Power Factor Mode Select Under Excited Power Factor Mode Select Curve Power Factor Mode Select Q u Power Factor h GMPPT If the user s PV module is blocked by a fixed object...

Page 49: ...fault value of PFLockInPoint is 1 05 When Vac 1 05Vn Pac 0 2 Pn curve cos cp f P corresponds to curve B PU Function Enable PU Function 220 0V Response V2 PU Function 250 0V Response V3 PU Function 265...

Page 50: ...nd response method required by the NZS4777 2 standard and is only applicable to NZS4777 2 The default value is enable Select Disable to disable this function Export Control General Control AS 4777 Set...

Page 51: ...is only supported by inverters whose 6th digit of the SN is A or C and whose hardware has a WiFi reset circuit Setting failed Advance Password Set OK Advance Password ShutDown Enable ShutDown w Micro...

Page 52: ...Inverter Battery Internal Code BMS Code Inverter code EPS Run Time Inverter Inverter SN 01234560123456 Inverter DSP 2 07 Inverter Register SN SWNZJ23ZUR Inverter ARM 1 03 Inverter Inverter Battery Ab...

Page 53: ...rmation Once settings are selected at commissioning they are locked to view only In case of a Path Diagram with the mark of it indicates that such a Path Diagram is only applicable to Australia and Ne...

Page 54: ...load connections on the EPS O grid Move this load to check for recovery Or ask for help from the installer if it can not return to normal DCV OVP Fault DCV EPS Off grid overvoltage protection failure...

Page 55: ...ceed the system requirements and press the ESC key to restart the inverter Or ask for help from the installer if it can not return to normal Inverter EEPROM Fault Shut down photovoltaic battery and gr...

Page 56: ...ttery master slave control mismatches Upgrade the battery BMS software Please contact the battery supplier Battery charging request does not respond to a fault Upgrade the battery BMS software Please...

Page 57: ...verter and absorb dust if necessary This work should be performed from time to time 2 Check whether the frequency converter indicator is normal check whether the frequency converter button is normal c...

Page 58: ...ority from SolaX Inverter is installed operated under improper environment or electrical condition mentioned in this manual without authority from SolaX Inverter is changed updated or disassembled on...

Page 59: ......

Page 60: ...OUR INVERTER ONLINE WIN SOLAX POINTS Open your camera app and point your device at the QR code Wait for the camera to recognize the QR code Click banner or notification when it appears on the screen W...