INSTALLATION
1. Floor/Wall Mounting
Note
:
•
Customers are supposed to
estimate the GND wire first
according to their actual
installation site;
•
Then connect GND wire with
battery module;
•
Then start installing: floor
mounting or Wall mounting;
•
Lastly, connect power line &
Communication line between
BMS and battery module;
Summary of Contents for T-BAT H11.2
Page 1: ...Triple Power High Voltage Storage System www solaxpower com...
Page 11: ...INSTALLATION Design Sketch...
Page 12: ...INSTALLATION Complete Installation Drawing...
Page 16: ...INSTALLATION 2 Power Line Connection Actual Connection Diagram...
Page 24: ...STATUS INDICATOR BMS Status Indicator Charge Discharge 60 Power...