V
Overview
(
Wall
Mounting
)
Scheme A
Distance from the equipment:
To left side:
≥
11.81 in./300 mm
To right side:
≥
11.81 in./300 mm
To the ground :
>
23.62 in./600 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)
Scheme A
2 * Wall Bracket
2 * Expansion Bolt
2 * Tapping Screw
2 * Gasket
14 * M5*10 Screw
2 * Platen (3 holes)
4 * Platen (2 holes)
BMS
Battery
Battery
Base
31.81 in./808 mm
BMS
Battery
Battery
Base
Scheme B
BMS
Battery
Battery
Base
Battery
Distance from the equipment:
To left side:
≥
11.81 in./300 mm
To right side:
≥
11.81 in./300 mm
To the ground:
>
11.81 in./300 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)
4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw
4 * Gasket
20 * M5*10
4 * Platen (3 holes)
4 * Platen (2 holes)
43.62 in./1,108 mm
BMS
Battery
Battery
Base
Battery
Scheme C
Distance from the equipment:
To left side:
≥
11.81 in./300 mm
To right side:
≥
11.81 in./300 mm
To the ground: It shall be decided according to the local regulations.
4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw
4 * Gasket
24 * M5*10
4 * Platen (3 holes)
6 * Platen (2 holes)
BMS
Battery
Battery
Base
Battery
Battery
55.43 in./1,408 mm
BMS
Battery
Battery
Base
Battery
Battery
Steps (Wall Mounting)
V
I
Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion.
Take Scheme C as an example.
Step 1: There are two ways to install Transverse Plate to Base Support due to 4 kinds of Stub Spacing, with details as follows: (a) 28 in./711.20 mm or 32
in./812.80 mm; (b) 20 in./508.00 mm or 24 in./609.60 mm.
(1) Insert Transverse Plate to Base Support;
(2) Secure the Transverse Plate and Base Support using screws (2×M5*8 countersunk head screw) (Tighten torque: 2.2-2.5 N·m). See figure below.
Platen (2 holes)
×
2
M5*10 Screw
×
4
1.0 N·m
Step 7:
(1) Attach the M5 * 10 screw to Wall Bracket but be sure not to tighten;
(2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery
Module, and use a spirit level to ensure it's even;
(3) Accurately mark the location of the Wall Bracket on both sides with a pen;
(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 mm) by
a Drill (
φ
0.39 in./10 mm).
Electric drill dust collector is recommended.
Note!
Step 8: Place Expansion Bolts into the two holes (the Expansion Bolt is not required in
case of solid wood wall).
32 in./8
12.80 m
m
VII
Wiring
①
Insert the orange power line into the orange socket
②
Insert the black power line into the black socket
③
Screw the communication line into the communication socket
Before wiring,
1. Unscrew the cap at BMS clockwise;
2. Unscrew the screws at BAT+ and BAT- respectively.
After wiring
①
②
③
DIP
BMS
BAT+
BAT-
POWER
V
III
Commissioning
If the batteries have not been used for more than 9 months, these batteries must be charged to at least SOC 50 % each time.
For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months.
If a battery is replaced or added for capacity expansion, each battery's SOC should be consistent. The max. SOC difference should be
between ±5%.
If users want to increase their battery system capacity, please ensure that the SOC of the existing system capacity is about 40%. The
manufacture date of the new battery shall not exceed 6 months; in case of exceeding 6 months, please charge the new battery to around
40%.
Black Start: Press the POWER button and hold it for 20 sec; release the button after the four SOC indicators flash blue alternately. But, we
do not recommend the use of Black Start as it may cause the port to be charged, resulting in an electric shock.
Steps for commissioning are shown
as
follows
:
①
Press the left side door panel
②
Open the air switch's guard and toggle switch, to ensure that
the inverter does charge to the battery
③
Press the right side door panel
④
Press the button for 1 to 2 sec, and then the system starts
320102033203
Press the right side door panel
③
BMS
DIP
POWER
BAT-
BAT+
④
Press the left side door panel
①
②
The equipment can support capacity expansion.
There are two circumstances in case the user wants to increase a battery module:
1. For floor mounting, remove the inverter before increase of battery module;
2. For wall mounting, if the distance from the equipment to the ground is enough, do not remove the inverter; otherwise, the inverter shall
be removed.
BMS
Battery
Battery
Base
BMS
Battery
Battery
Base
Battery
BMS
Battery
Battery
Base
Battery
Battery
(1)
(2)
Sequence
1
2
3
4
5
6
7
8
BMS
/
/
BMS_H BMS_L
/
A1
B1
GND
Making a BMS communication cable
To ensure normal operation of BMS and inverter, a BMS communication cable is
required to be made before wiring.
The specific definition of the communication cable is shown as follows:
The wire order of the communication cable is as follows:
1 2 3 4 5 6 7 8
1) Orange stripes on white
2) Orange
3) Green stripes on white
4) Blue
5) Blue stripes on white
6) Green
7) Brown stripes on white
8) Brown
(a)
(b)
32 in/812.80 mm
28 in/711.20 mm
20 in/508.00 mm
24 in/609.60 mm
Note: The bubble spirit level on the Transverse Plate can be used as an auxiliary tool, additionally, please prepare a spirit level to measure whether the Plate is even or not.
Step 12:
(1) Attach the M5 * 10 screw to Wall Bracket but be sure not to tighten;
(2) Place such Wall Bracket to the wall, align its holes to the holes on the
Battery Module, and use a spirit level to ensure it's even;
(3) Accurately mark the location of the Wall Bracket on both sides with a
pen;
(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and then drill the two holes (at least 3.54
in./90 mm) by a Drill (
φ
0.39 in./10 mm);
(6) Place Expansion Bolts;
(7) Secure Wall Brackets using Tapping Screws and Gaskets. Refer to the
Steps 7, 8, 9 and 10.
32 in./8
12.80 m
m
Step 7
,
8, 9 and 10
Let the Platen
down
Tapping Screw × 2
Gasket × 2
Wall Bracket × 2
32 in/81
2.80 mm
Mark
Electric drill dust collector is recommended
.
Note!
Step 11: Fix the Platen (3 holes), and secure M5*10 screws on both
sides(Torque: 1.0 N·m).
Step 10: Place the fourth battery module.
Let the Platen
down
Platen (3 holes)
×
2
M5*10 Screw
×
6
1.0 N·m
Step 9: Place the Wall Bracket on the wall where the mark is drawn previously,
and then secure the Wall Brackets on the wall using Tapping Screws and
Gaskets.
32 in./81
2.80 mm
Tapping Screw × 2
Gasket × 2
Wall Bracket × 2
Attach screw but not tighten,
and align the hole location of
battery
Mark
Step 13: Place BMS on the Battery Module.
(1) Remove the bottom dust cover.
(2) Place BMS, fix the Platen (3 holes) on both sides, and then tighten
M5*10 screws (Torque: 1.0 N·m). Refer to Step 11.
Step 12
Platen (3 holes)
×
2
M5*10 Screw
×
6
2.2-2.5 N·m
The holes on BMS is for secure inverter. For details, please refer to A1-
ESS-G2 User Manual.
Note!
The BMS communication cable shall have a shield layer.
Note!
Step 2:
(1) Place the assembled Transverse Plate and Base Support on the wall, look
the cylindrical plastic bubble spirit level on the Transverse Plate. If the bubble
isn't in the center, slightly bow it to the horizontal.
(2) Then determine the position of holes.
(3) Mark it with a pen.
(4) Remove it and drill the four holes (at least 3.54 in./90 mm) by Drill (
φ
0.47
in./12 mm for concrete wall, or
φ
0.31 in./8 mm solid wood wall).
Note: In case of solid wood wall, please directly tighten the screws with
torque wrench instead of hammering them with rubber mallet.
Note: The distance from the Base to the ground is
decided according to the local regulations.
Ground
32 in./8
12.80 m
m
Bubble
spirit level
Step 3:
(1) Place the assembled Transverse Plate and Base Support to the wall (or
solid wood stub);
(2) Attach the Expansion Screw to the holes but be sure not to tighten;
(3) Check whether the bubble spirit level is horizontal;
(4) Hammer Expansion Screws with a rubber mallet (except solid wood
wall), and tighten it with torque wrench.
Φ
0.31 in./8 mm
for Base Support
≥
1.97 in./
50 mm
90º
Φ
0.47 in./12 mm
for Base Support
≥
3.54 in./
90 mm
90º
(1) Concrete Wall
(2) Solid Wood Wall
Bubble
spirit level
32 in./8
12.80 m
m
Φ
0.47 in./12 mm
For concrete wall
x 4
Φ
0.31 in./8 mm
For solid wood wall
x 4
M5*20
Screw
×
4
2.2 - 2.5 N·m
32 in./8
12.80 m
m
Step 4: Place the base.
(1) Remove the dust cover.
(2) Place Base on the Base Support and
secure both left and right sides with screws
(4 × M5*20 countersunk screw) (Tighten
torque: 2.2-2.5 N·m).
Step 5: Place Battery Module on the Base.
(1) Remove the top and bottom dust covers.
(2) Place the Battery Module on the Base.
(3) Fix the Platen (2 holes) using M5 * 10 Phillips-head screw, and
secure M5*10 screws at both sides (Torque: 1.0 N·m).
Step 6 (3)
Step 6 (3)
Platen (2 holes)
×
4
M5*10 Screw
×
8
1.0 N·m
Step 6: Place two Battery Modules in turn, and secure both left and
right sides with screws (4 × M5*20 countersunk screw) (Tighten
torque: 2.2-2.5 N·m). Refer to the Step 5 (3).
Please
secure Platen and M5*10 screws immediately after placing a
Battery Module.
Attach screw but
not tighten
Mark
32 in./812.80 mm
Φ
0.39 in./10 mm
for Wall Bracket
≥
3.54 in./
90 mm