background image

V

Overview

 (

Wall

 Mounting

)

Scheme A

Distance from the equipment:
To left side: 

 11.81 in./300 mm

To right side: 

 11.81 in./300 mm

To the ground : 

 23.62 in./600 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)

Scheme A

2 * Wall Bracket
2 * Expansion Bolt
2 * Tapping Screw 
2 * Gasket
14 * M5*10 Screw
2 * Platen (3 holes)
4 * Platen (2 holes)

BMS

Battery

Battery

Base

31.81 in./808 mm

BMS

Battery

Battery

Base

Scheme B

BMS

Battery

Battery

Base

Battery

Distance from the equipment:
To left side: 

 11.81 in./300 mm

To right side: 

 11.81 in./300 mm

To the ground: 

 11.81 in./300 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)

4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw 
4 * Gasket
20 * M5*10
4 * Platen (3 holes)
4 * Platen (2 holes)

43.62 in./1,108 mm

BMS

Battery

Battery

Base

Battery

Scheme C

Distance from the equipment:

To left side: 

 11.81 in./300 mm

To right side: 

 11.81 in./300 mm

To the ground: It shall be decided according to the local regulations.

4 * Wall Bracket
4 * Expansion Bolt
4 * Tapping Screw 
4 * Gasket
24 * M5*10
4 * Platen (3 holes)
6 * Platen (2 holes)

BMS

Battery

Battery

Base

Battery

Battery

55.43 in./1,408 mm

BMS

Battery

Battery

Base

Battery

Battery

Steps (Wall Mounting)

V

I

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion.

Take Scheme C as an example.

Step 1: There are two ways to install Transverse Plate to Base Support due to 4 kinds of Stub Spacing, with details as follows: (a) 28 in./711.20 mm or 32 

in./812.80 mm; (b) 20 in./508.00 mm or 24 in./609.60 mm.

(1) Insert Transverse Plate to Base Support;

(2) Secure the Transverse Plate and Base Support using screws (2×M5*8 countersunk head screw) (Tighten torque: 2.2-2.5 N·m). See figure below.

Platen (2 holes) 

×

 2

M5*10 Screw 

×

 4

1.0 N·m

Step 7: 
(1) Attach the M5 * 10 screw to Wall Bracket but  be sure not to tighten;

(2) Place such Wall Bracket to the wall, align its holes to the holes on the Battery 
Module, and use a spirit level to ensure it's even;
(3) Accurately mark the location of the Wall Bracket on both sides with a pen;

(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 in./90 mm) by 
a Drill (

φ

 0.39 in./10 mm). 

Electric drill dust collector is recommended.

Note!

Step 8: Place Expansion Bolts into the two holes (the Expansion Bolt is not required in 

case of solid wood wall).

32 in./8

12.80 m

m

VII

Wiring 

 Insert the orange power line into the orange socket

 Insert the black power line into the black socket

 Screw the communication line into the communication socket

Before wiring, 
1. Unscrew the cap at BMS clockwise;

2. Unscrew the screws at BAT+ and BAT- respectively.

After wiring

DIP

BMS

BAT+

BAT-

POWER

V

III

Commissioning

If the batteries have not been used for more than 9 months, these batteries must be charged to at least SOC 50 % each time.

For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months.
If a battery is replaced or added for capacity expansion, each battery's SOC should be consistent. The max. SOC difference should be 
between ±5%.
If  users  want  to  increase  their  battery  system capacity,  please  ensure  that  the  SOC  of  the  existing  system capacity  is  about  40%.  The 
manufacture date of the new battery shall not exceed 6 months; in case of exceeding 6 months, please charge the new battery to around 

40%.

Black Start: Press the POWER button and hold it for 20 sec; release the button after the four SOC indicators flash blue alternately. But, we 

do not recommend the use of Black Start as it may cause the port to be charged, resulting in an electric shock.

Steps for commissioning are shown

 

as

 

follows

Press the left side door panel

Open the air switch's guard and toggle switch, to ensure that 

the inverter does charge to the battery

Press the right side door panel

Press the button for 1 to 2 sec, and then the system starts

320102033203

Press the right side door panel

BMS

DIP

POWER

BAT-

BAT+

Press the left side door panel


The equipment can support capacity expansion. 
There are two circumstances in case the user wants to increase a battery module: 

1. For floor mounting, remove the inverter before increase of battery module;
2. For wall mounting, if the distance from the equipment to the ground is enough, do not remove the inverter; otherwise, the inverter shall 

be removed.

BMS

Battery

Battery

Base

BMS

Battery

Battery

Base

Battery

BMS

Battery

Battery

Base

Battery

Battery

(1)

(2)

Sequence

1

2

3

4

5

6

7

8

BMS

/

/

BMS_H BMS_L

/

A1

B1

GND 

Making a BMS communication cable

To ensure normal operation of BMS and inverter, a BMS communication cable is 
required to be made before wiring.
The specific definition of the communication cable is shown as follows:

The wire order of the communication cable is as follows:

1 2 3 4 5 6 7 8

1) Orange stripes on white
2) Orange
3) Green stripes on white
4) Blue
5) Blue stripes on white
6) Green
7) Brown stripes on white
8) Brown

(a)

(b)

32 in/812.80 mm

28 in/711.20 mm

20 in/508.00 mm

24 in/609.60 mm

Note: The bubble spirit level on the Transverse Plate can be used as an auxiliary tool, additionally, please prepare a spirit level to measure whether the Plate is even or not.

Step 12: 

(1) Attach the M5 * 10 screw to Wall Bracket but  be sure not to tighten;
(2) Place such Wall Bracket to the wall, align its holes to the holes on the 

Battery Module, and use a spirit level to ensure it's even;
(3) Accurately mark the location of the Wall Bracket on both sides with a 
pen;
(4) Circle along the inner ring of the holes;
(5) Remove the Wall Bracket, and then drill the two holes (at least 3.54 
in./90 mm) by a Drill (

φ

 0.39 in./10 mm);

(6) Place Expansion Bolts;

(7) Secure Wall Brackets using Tapping Screws and Gaskets. Refer to the 

Steps 7, 8, 9 and 10.

32 in./8

12.80 m

m

Step 7

,

 8, 9 and 10

Let the Platen 

down

Tapping Screw × 2

Gasket × 2

Wall Bracket × 2

32 in/81

2.80 mm

Mark

Electric drill dust collector is recommended

.

Note!

Step 11: Fix the Platen (3 holes), and secure M5*10 screws on both 

sides(Torque: 1.0 N·m).

Step 10: Place the fourth battery module.

Let the Platen 

down

Platen (3 holes) 

×

 2

M5*10 Screw 

×

 6

1.0 N·m

Step 9: Place the Wall Bracket on the wall where the mark is drawn previously, 

and then secure the Wall Brackets on the wall using Tapping Screws and 
Gaskets.

32 in./81

2.80 mm

Tapping Screw × 2

Gasket × 2

Wall Bracket × 2

Attach screw but not tighten, 

and align the hole location of 

battery

 

Mark

Step 13: Place BMS on the Battery Module. 
(1) Remove the bottom dust cover.

(2) Place BMS, fix the Platen (3 holes) on both sides, and then tighten 

M5*10 screws (Torque: 1.0 N·m). Refer to Step 11.

Step 12

Platen (3 holes) 

×

 2

M5*10 Screw 

×

 6

2.2-2.5 N·m

The holes on BMS is for secure inverter. For details, please refer to A1-

ESS-G2 User Manual.

Note!

The BMS communication cable shall have a shield layer.

Note!

Step 2: 

(1) Place the assembled Transverse Plate and Base Support on the wall, look 

the cylindrical plastic bubble spirit level on the Transverse Plate. If the bubble 
isn't in the center, slightly bow it to the horizontal. 

(2) Then determine the position of holes.

(3) Mark it with a pen.
(4) Remove it and drill the four holes (at least 3.54 in./90 mm) by Drill (

φ

 0.47 

in./12 mm for concrete wall, or 

φ

 0.31 in./8 mm solid wood wall).

Note:  In case of solid wood wall, please directly tighten the screws with 

torque wrench instead of hammering them with rubber mallet.

Note: The distance from the Base to the ground is 

decided according to the local regulations.

Ground

32 in./8

12.80 m

m

 Bubble 

spirit level

Step 3: 

(1) Place the assembled Transverse Plate and Base Support to the wall (or 

solid wood stub);
(2) Attach the Expansion Screw to the holes but be sure not to tighten;

(3) Check whether the bubble spirit level is horizontal;
(4) Hammer Expansion Screws with a rubber mallet (except solid wood 
wall), and tighten it with torque wrench.

Φ

 

0.31 in./8 mm 

for Base Support

 1.97 in./ 

50 mm

90º

Φ

 0.47 in./12 mm 

for Base Support

 3.54 in./ 

90 mm

90º

(1) Concrete Wall

(2) Solid Wood Wall

Bubble 

spirit level

32 in./8

12.80 m

m

Φ

0.47 in./12 mm

For concrete wall

x 4

Φ

0.31 in./8 mm

For solid wood wall

x 4

M5*20

 

Screw 

×

 4

2.2 - 2.5 N·m

32 in./8

12.80 m

m

Step 4: Place the base. 

(1) Remove the dust cover.

(2) Place Base on the Base Support and 
secure both left and right sides with screws 

(4 × M5*20 countersunk screw) (Tighten 
torque: 2.2-2.5 N·m).

Step 5: Place Battery Module on the Base.

(1) Remove the top and bottom dust covers.
(2) Place the Battery Module on the Base.

(3) Fix the Platen (2 holes) using M5 * 10 Phillips-head screw, and 

secure M5*10 screws at both sides (Torque: 1.0 N·m).

Step 6 (3)

Step 6 (3)

Platen (2 holes) 

×

 4

M5*10 Screw 

×

 8

1.0 N·m

Step 6: Place two Battery Modules in turn, and secure both left and 
right sides with screws (4 × M5*20 countersunk screw) (Tighten 
torque: 2.2-2.5 N·m). Refer to the Step 5 (3). 

Please

 

secure Platen and M5*10 screws immediately after placing a 

Battery Module. 

Attach screw but 

not tighten

Mark

32 in./812.80 mm

Φ

 0.39 in./10 mm

for Wall Bracket

 3.54 in./ 

90 mm

Reviews: