Power Control
Power control options are detailed in the
Power Control Application
Note, available on the SolarEdge website at .
The Grid Control option may be disabled. Enabling it opens additional
options in the menu.
The Energy Manager option is used for setting power export limitation,
as described in the
Export Limitation Application Note, available on the
SolarEdge website at
https://www.solaredge.com/sites/default/files/export_limitation_
For P(Q) diagram refer to
https://www.solaredge.com/sites/default/files/application_note_p_q_
diagram_of_se_inverters_en_and_na.pdf
.
NOTE
SolarEdge inverters with “Grid Support” functionality (as marked on the
inverter certification label), are compliant with UL 1741 Supplement A. The
functionality is built into the inverter and no additional external device is
required.
Step 3: Verifying Proper Activation and
Commissioning
1. Select
Information
and verify that the correct firmware versions are installed on each
inverter.
2. Select
Status
and verify that inverter is operating and producing power.
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
Reporting and Monitoring Installation Data
Monitoring the site requires connecting the inverter to the monitoring platform, using
any of the wired or wireless options available from SolarEdge. Refer to
Communication to the Monitoring Platform on page 47.
Chapter 5: Activating, Commissioning and Configuring the System
43
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.4