Installing multiple base, tall, and scope cabinets
Step 1
•
Attach the run of bases together using wood screws, making sure
the bases are flush front to back and top to bottom. Position the
run of bases against the wall. Access leveling feet inside of bases,
and, with a flat head screwdriver, adjust the feet until the run of
bases is level.
Step 2
•
Mount the bases directly to wall using appropriate fasteners for the
type of wall construction.
Step 3
•
Place the end cabinet on the base. For cabinet with no finished
ends or two finished ends, center the cabinet. For cabinet with one
finished end, flush the adjacent cabinet and base end panels.
Step 4
•
Plumb the cabinet and secure it to the wall through the back panel
using appropriate fasteners. See figure for placement.
Step 5
•
Repeat Steps 1-4 with additional cabinets, making sure each is
level and plumb.
Questions? Call a Technical Services representative at 888-435-2256
Installation Instructions – Evolve Cabinets
3
(16")
VARIES
DEPENDENT ON
STUD SPACING
12"
12"
CENTERED
(OPTIONAL
MOUNTING
LOCATION)
SUGGESTED
MOUNTING
LOCATION
SUGGESTED
MOUNTING
LOCATION
STUD
NOTE: USE APPROPRIATE
FASTENERS FOR WALL TYPE
(16")
VARIES
DEPENDENT ON
STUD SPACING
12"
12"
SUGGESTED
MOUNTING
LOCATION
NOTE: USE APPROPRIATE
FASTENERS FOR WALL TYPE
SUGGESTED
MOUNTING
LOCATION
STUD
SUGGESTED
MOUNTING
LOCATION
STUD
4
1
4
"
SUGGESTED
MOUNTING
LOCATION
4
1
4
"
(16")
VARIES
DEPENDENT ON
STUD SPACING
5"
SUGGESTED
MOUNTING
LOCATION
5"
(16")
VARIES
DEPENDENT ON
STUD SPACING
NOTE: USE APPROPRIATE
FASTENERS FOR WALL TYPE
CENTERED
(OPTIONAL
MOUNTING
LOCATION)
LEVELING FEET
IMAGE OF BASE
Cabinet Base
Leveling feet
S t o r a g e s o l u t i o n s f o r h e a l t h c a r e