Operating Instructions and Installation Guide
Tri - System
_______________________
3DJH
2.3
Pipes – Important
Critical: Due to the high
temperature imposed by solar
heated water, all solar system
brass and copper, including
(as supplied). No plastic pipes
t
Flow and return lines must be
installed as direct as possible
between tank and collector.
t
Pipes
must
be fully insulated
with
UV stabilized insulation suitable for
solar working temperatur es. We
Solar insulation, minimum 13mm
thick (refer to local regulations).
Note: Warranty will be void
if this minimum insulation
requirement is not used.
t
It is
critical
to stop any chance of an
air lock developing, so ensure that:
– no pipework is higher than the
automatic air vent valve
3LSHVPXVWKDYHQR
KLJKSRLQWVWKDWDOORZ
DLUWREHWUDSSHG
1RSLSHVFDQEHKLJKHUWKDQ
WKHDLUEOHHGYDOYH
–
collectors to the water storage tank
have a minimum of 5° continuous fall
– pipes have no high points that
allow air to be trapped
– the minimum number of bends in
the pipes are used.
t
Flow and return lines should be
neatly installed and hidden inside the
roof cavity if possible.
t
,
f
o
or
e
h
t
h
g
u
o
r
h
t
s
e
n
i
l
n
r
u
t
e
r
d
n
a
cladding and the eaves.
Note: Where roof and
the eaves are made from
asbestos, specialised
handling
and advice is necessary.
0LQLPXP
FRQWLQXRXVIDOO
7RFROOHFWRUV
LQVXODWHIORZ
DQGUHWXUQ
SLSHV
0LQLPXP
FRQWLQXRXVIDOO
7RFROOHFWRUV
1RQFRQWLQXRXV
IDOO
7RFROOHFWRUV
Incorrect
Correct
(QVXUHIORZDQGUHWXUQSLSHVIURPWKHVRODUFROOHFWRUVWRWKH
ZDWHUVWRUDJHWDQNKDYHDPLQLPXPRIFRQWLQXRXVIDOO
Tank Installation Requirements
___________________________
Summary of Contents for SAWE-20-270
Page 10: ...3DJH _______________________...