
3D Coordinates
3D Coordinates
Coordinates may be absolute or relative depending on
Coordinates may be absolute or relative depending on
survey requirements
survey requirements
Surveying the area of a mining site would require
Surveying the area of a mining site would require
relative coordinates, therefore, the initial instrument
relative coordinates, therefore, the initial instrument
X,Y,Z coordinates may be 5000, 5000, 100
X,Y,Z coordinates may be 5000, 5000, 100
Surveys that have to match a downloaded aerial photo
Surveys that have to match a downloaded aerial photo
from the USGS would have to match UTM NAD83
from the USGS would have to match UTM NAD83
coordinates so the starting point would have to be
coordinates so the starting point would have to be
determined by an accurate GPS receiver
determined by an accurate GPS receiver
Summary of Contents for SET 550
Page 2: ...Parts of the SET Total Station Parts of the SET Total Station ...
Page 3: ...Parts of the SET Total Station Parts of the SET Total Station ...
Page 4: ...Sokkia SET 550 Total Station Sokkia SET 550 Total Station Keys Screen Keys Screen ...
Page 5: ...SET 550 SET 550 Menu Pages Menu Pages ...