
Step 4: Leveling
Step 4: Leveling
…
…
Observe the survey point in the optical
Observe the survey point in the optical
plummet and center the point by loosening the
plummet and center the point by loosening the
centering screw and sliding the entire
centering screw and sliding the entire
instrument
instrument
After re
After re
-
-
tightening the centering screw check
tightening the centering screw check
to make sure the plate level bubble is level in
to make sure the plate level bubble is level in
several directions
several directions
Summary of Contents for SET 550
Page 2: ...Parts of the SET Total Station Parts of the SET Total Station ...
Page 3: ...Parts of the SET Total Station Parts of the SET Total Station ...
Page 4: ...Sokkia SET 550 Total Station Sokkia SET 550 Total Station Keys Screen Keys Screen ...
Page 5: ...SET 550 SET 550 Menu Pages Menu Pages ...