![Sojag 500-4155921 Owner'S Manual Download Page 34](http://html.mh-extra.com/html/sojag/500-4155921/500-4155921_owners-manual_1312646034.webp)
34
Parts required for this step / Pièces requises pour cette étape :
assembly
assemblage
© Sojag inc. 2014
Étape 16
16.1 Installer les moustiquaires (S) sur les rails en
insérant les crochets (T), les uns après les autres,
dans chacun des oeillets.
Répéter cette étape pour les quatre moustiquaires (S).
step 16
16.1 Install the mosquito netting (S) along the tracks
by inserting the hooks (T) one at a time into the
eyelets found along the top border of the netting.
Repeat for all four netting panels.
S
X
4
NOtE:
The netting should be installed starting in the middle of the 3.05
m (10 ft.) side of the unit, wrap around the inside of the post, and
finish the installation in the middle of the next side of the unit.
The zippers to close the netting will therefore meet in the centre
of each side of the sun shelter.
NOtE :
Les moustiquaires doivent être installées à l’intérieur de l’abri,
en commençant par le milieu d’un côté de 3,05 m (10 pi) de l’abri
et en se terminant au milieu du côté adjacent. Les fermetures à
glissière vont alors se rencontrer au centre de chacun des côtés
de l’abri.
Summary of Contents for 500-4155921
Page 2: ......
Page 19: ...19 Sojag inc 2014 X4 J1 D D U1 J1 D1 D1 D D1 ...
Page 21: ...21 Sojag inc 2014 X4 D D1 D D D1 D1 U ...
Page 23: ...23 Sojag inc 2014 X6 X6 U E E E E E E E E U1 J1 J1 C1 C C1 C B B1 B B1 ...
Page 25: ...25 Sojag inc 2014 J J V1 V1 V1 J1 ...
Page 27: ...27 Sojag inc 2014 This Side Up Ce côté vers le haut M1a M1a Ma Ma P D E E D1 D E D1 ...
Page 29: ...29 Sojag inc 2014 Mb Mb M1b M1b P1 N1 N1 N N N2 This Side Up Ce côté vers le haut ...
Page 35: ...35 Sojag inc 2014 S S S S A T X4 X4 X60 ...
Page 37: ...37 Sojag inc 2014 A2 A2 ...
Page 38: ...Notes ...
Page 39: ...Notes ...
Page 40: ...Printed in China Imprimé en Chine www sojag ca ...