Installation Guide:
Ü
Place machine 6 to 12 inches above from ground, This will escape it from sudden water
flow, dust and scrap.
Ü
Leave at least 6 inches space all-around the machine for proper cooling.
Ü
Connect power supply through MCB or MCCB, never connect through old(used) knife
type power on switch
Ü
Be sure machine body is properly grounded, before switching it on.
Ü
Switch off machine during connecting or removal of output leads.
Ü
Throughly tighten the fasteners of output terminals.
Supply Cable:
4-core 2.5 mm sq. for IR300 & IRT 300
4-core 4 mm sq. for IR400 & IRT 400
4-core 6 mm sq. for IR500 & IRT500
Welding or Work cable:
35 mm sq. for IR300 & IRT 300
50 mm sq. for IR400 & IRT 400
75 or 50 mm sq. for IR500 & IRT500
Tig Torch:
Air Cooled for IRT 300
Air Cooled or Water Cooled(preffered) IRT 400
Water Cooled IRT500
5