5. Buttons and indicator lights

Fig.5-1 Buttons and indicator lights

5.1. Buttons

press “Back” to the previous screen or enter the main interface.

press “Up” to the upper menu option or value plus 1.

press “Down” to the lower menu option or value minus 1.

Press “OK” to select the current menu option or switch to the next digit.

5.2. Indicator lights and status

Status

On Grid

Green light

Off-Grid

Green light

Alarm

Red light

On-grid

ON

Standby (On-Grid)

Flashing

Off-Grid

ON

Standby (Off-Grid)

Flashing

Alarm

ON

Summary of Contents for HYD 10KTL-3PH

Page 1: ...Shenzhen SOFARSOLAR Co Ltd Energy storage integrated inverter Product Model HYD 5K 20KTL 3PH User manual ...

Page 2: ...s 12 3 5 Installation Environment 13 3 6 Determining the Installation Position 14 3 7 Moving the HYD 5 20KTL 3PH 15 3 8 Installing HYD 5 20KTL 3PH 15 4 Electrical Connections 17 4 1 Wire instructions 18 4 2 Connecting PGND Cables 19 4 3 Battery Connection PV Connection 20 4 4 Load connection 21 4 5 Grid connection 22 4 6 External communication interface 23 4 7 Communication method 33 5 Buttons and...

Page 3: ...t even when it is transferred to another user or field Copyright Declaration The copyright of this manual belongs to Shenzhen SOFARSOLAR Co Ltd Any corporation or individual should not plagiarize partially copy or fully copy it including software ect and no reproduction or distribution of it in any form or by any means All right reserved SOFARSOLAR reserves the right of final interpretation This m...

Page 4: ...and troubleshooting of HYD 5 20KTL 3PH inverters HYD 5KTL 3PH HYD 6KTL 3PH HYD 8KTL 3PH HYD 10KTL 3PH HYD 15KTL 3PH HYD 20KTL 3PH Keep this manual where it will be accessible at all times Target Group This manual is intended for qualified electrical technical personnel who are responsible for inverter installation and commissioning in the PV power system and PV plant operator Symbols Used This man...

Page 5: ... hazardous situation which if not avoided could result in death or serious injury Warning Caution indicates a hazardous situation which if not avoided could result in minor or moderate injury Caution Attention indicates potential risks which if not avoided may lead to equipment fault or property damage Attention Note provides tips that are valuable for the optimal operation of the product Note ...

Page 6: ...can also turn the switch in the PV combiner box OFF to cut off the high voltage DC When the battery needs to be installed please confirm the positive and negative terminals of the battery and turn OFF the battery Otherwise serious injury may be caused Qualified persons The customer must make sure the operator has the necessary skill and training to do his her job Staff in charge of using and maint...

Page 7: ...enzhen SOFARSOLAR Co Ltd for help if necessary Transport of the equipment especially by road must be carried out with by suitable ways and means for protecting the components in particular the electronic components from violent shocks humidity vibration etc Labels on the equipment Electric connection Please comply with all the current electrical regulations about accident prevention in dealing wit...

Page 8: ...rter is working Please wear protective gloves Attention Maintenance and repair Before any repair work turn OFF the AC circuit breaker between the inverter and electrical grid first then turn OFF the DC switch After turning OFF the AC circuit breaker and DC switch wait for 5 minutes at least before carrying out any maintenance or repair work Danger Inverter should work again after removing any faul...

Page 9: ...and inverter are reliably grounded to protect the PV system and personnel security Attention Ensure input DC voltage Max DC voltage Over voltage may cause permanent damage to inverter or other losses which will not be included in warranty Warning Signs on the inverter There are some symbols which are related to security on the inverter Please read and understand the content of the symbols and then...

Page 10: ...EC standard 70 1 EN 60529 June 1997 Positive pole and negative pole of the input voltage DC This side up HYD 5 20KTL 3PH inverter must always be transported handled and stored in such a way that the arrows always point upwards RCM Regulatory Compliance Mark The product complies with the requirements of the applicable Australian standards ...

Page 11: ...e The HYD 5 20KTL 3PH inverter has a variety of built in operating modes to suit the diverse user needs The HYD 5 20KTL 3PH inverter can provide a complete solution in the period of rising energy costs such as oil and coal the energy subsidy of photovoltaic grid connected system keeps falling In the period of continuous power supply and emergency power supply demand in mountainous areas or base st...

Page 12: ...erators with an automatic switchover time of less than 20 milliseconds a Dual MPP trackers with 1 5 DC overload b Flexible switching between grid tied mode and energy storage mode c Max battery charge and discharge efficiency 97 7 d 2 strings of battery input with maximum 50A charge and discharge current e Wide battery voltage range 180 800V f Off grid output can be connected to unbalanced load g ...

Page 13: ...HYD 5 20KTL 3PH User manual Copyright Shenzhen SOFARSOLAR Co Ltd 8 ...

Page 14: ... contact the dealer as soon as possible You are advised to remove the packing materials within 24 hours before installing the HYD 5 20KTL 3PH inverter Checking Deliverables Do NOT install the HYD 5 20KTL 3PH on flammable material Do NOT install the HYD 5 20KTL 3PH in an area used to store Flammable or explosive material Danger The enclosure and heat sink are very hot while the inverter is working ...

Page 15: ...ure Description Quantity 1 Inverter 1pcs 2 Rear panel 1pcs 3 PV input terminal 4pcs 4 PV input terminal 4pcs 5 Metal terminals secured to PV input power cables 4pcs 6 Metal terminals secured to PV input power cables 4pcs 7 BAT input terminal 2pcs 8 BAT input terminal 2pcs 9 Metal terminals secured to BAT input power cables 2pcs 10 Metal terminals secured to BAT input power cables 2pcs 11 M6 Hexago...

Page 16: ...s 15 Link port connector 1pcs 16 8 pin terminal Matching terminal resistance parallel system 1pcs 17 DRMs connector 1pcs 18 CT 6pin connector 1pcs 19 Three phase electronic energy meter 1pcs 20 Split Core Current Transformer 3pcs 21 COM 16pin connector 1pcs 22 Manual 1pcs 23 The warranty card 1pcs 24 Registration Form 1pcs ...

Page 17: ...PH inverter overview Table 3 2 HYD 5 20KTL 3PH inverter overview 1 Battery input terminals 7 DRMs 2 DC switch 8 COM 3 PV input terminals 9 Link Port 1 4 Load connection port 10 Link Port 0 5 Grid connection port 11 CT 6 USB WiFi 12 LCD 3 4 Tools Prepare tools required for installation and electrical connections Table 3 3 Tools required for installation and electrical connections NO Tool Model Func...

Page 18: ...d to ensure that the rear panel is properly installed 12 ESD gloves Operators wear 13 Safety goggles Operators wear 14 Anti dust respirator Operators wear 3 5 Installation Environment a Choose a dry clean and tidy place convenient for installation b Ambient temperature range 25 60 c Relative humidity 0 100 non condensed d HYD 5 20KTL 3PH inverter shall be installed in a well ventilated place e No ...

Page 19: ...d 14 3 6 Determining the Installation Position Determine an appropriate position for installing the HYD 5 20KTL 3PH inverter Comply with the following requirements when determining the installation position Fig 3 3 Installation Position of HYD 5 20KTL 3PH inverter ...

Page 20: ...otect its shell Attention 3 8 Installing HYD 5 20KTL 3PH Step 1 Determine the positions for drilling holes ensure the hole positions are level then mark the hole positions using a marker pen use the hammer drill to drill holes on the wall Keep the hammer drill perpendicular to the wall do not shake when drilling so as not to damage the wall If the error of the hole positions is too big you need to...

Page 21: ...HYD 5 20KTL 3PH User manual Copyright Shenzhen SOFARSOLAR Co Ltd 16 Fig 3 5 Installing HYD 5 20KTL 3PH ...

Page 22: ...lectrical engineer Wear rubber gloves and protective clothing protective glasses and boots when working on high voltage high current systems such as inverter and battery systems Attention PV modules generate electric energy when exposed to sunlight and can create an electrical shock hazard Therefore before connecting DC input power cable cover PV modules using opaque clot Danger For HYD 5 20KTL 3P...

Page 23: ...tion Component Description Recommended cable type Recommended cable specifications Connect the positive electrode of lithium battery Outdoor multi core copper cable Conductor cross sectional area 4mm2 6mm2 Connect the negative electrode of lithium battery Connect the positive electrode of photovoltaic cell Industry common outdoor photovoltaic cable Conductor cross sectional area 4mm2 6mm2 Connect ...

Page 24: ...es are prepared 4mm outdoor power cables are recommended for grounding purposes the color of cable should be yellow green Procedure Step 1 Remove the insulation layer with an appropriate length using a wire stripper as shown in Fig 4 1 Step 2 Insert the exposed core wires into the OT terminal and crimp them by using a crimping tool as shown in Fig 4 1 Step 3 Install the crimped OT terminal flat wa...

Page 25: ...ate length from the positive and negative power cables by using a wire stripper as show in Fig 4 2 Step 3 Insert the stripped positive and negative power cables into the positive and negative metal terminals respectively and crimp them using a clamping tool Ensure that the cables are crimped until they cannot be pulled out by force less than 400 N as shown in Fig 4 2 Step 4 Insert crimped power ca...

Page 26: ...nectors ensure that the DC SWITCH is OFF Fig 4 2 Connect Battery PV 1 Positive metal contact 2 Negative metal contact 3 Positive connector 4 Negative connector BAT Blue PV Black Disconnect PV connectors 4 4 Load connection Procedure Step 1 Select the appropriate cable type and specifications according to the table4 3 Refer to Fig 4 3 for processing wire Step 2 Pass the wire through the terminal as...

Page 27: ...s that the residual current exceeds 300mA the connection to the power grid will be quickly disconnected If the external ac switch has leakage protection function its rated leakage action current is required to be 300mA Procedure Step 1 Select the appropriate cable type and specifications according to the table4 3 Refer to Fig 4 4 for processing wire Step 2 Pass the wire through the terminal as sho...

Page 28: ... USB WIFI communication interface Fig 4 5 USB WIFI communication interface Table 4 4 Interface description PIN Definition Function Note 1 GND S USB power The USB power supply is 5V 1A Cannot be used for external device charging 2 DP USB data 3 DM USB data 4 VBUS USB power 4 6 2 DRMs interface Logic interface Fig 4 6 Logic interface ...

Page 29: ...nverter demand response modes DRMs The inverter will detect and initiate a response to all supported demand response commands within 2 s The inverter will continue to respond while the mode remains asserted Table 4 5 Function description of the DRMs terminal Pin NO Color Function 1 White and orange DRM1 5 2 Orange DRM2 6 3 White and green DRM3 7 4 Blue DRM4 8 5 White and blue DRM0 6 Green RefGen 7...

Page 30: ...onnected 6 G GND Relays common node 7 NC Not Connected Not Connected 8 NC Not Connected Not Connected Table 4 7 The inverter is preconfigured to the following RRCR power levels close is 1 open is 0 L1 L2 L3 L4 Active Power Cos φ 1 0 0 0 0 1 0 1 0 0 30 1 0 0 1 0 60 1 0 0 0 1 100 1 c Logic interface for EN50549 1 2019 is in order to cease active power output within five seconds following an instruct...

Page 31: ... Connected Not Connected 8 NC Not Connected Not Connected Table 4 9 The inverter is preconfigured to the following RRCR power levels close is 1 open is 0 L1 Active Power Power drop rate Cos φ 1 0 5 seconds 1 0 100 1 4 6 3 COM Multifunction communication interface Fig 4 9 COM interface Please refer to the following figure for RS485 connection When you need to use RS485 as a cascade of monitoring be...

Page 32: ...0 RS485 differential signal 11 485TX0 RS485 differential signal 12 GND S Signal GND Sampling battery temperature 13 BAT_Temp Battery temperature sampling 14 DCT1 Dry Contact1 Providing electrical switching function 15 DCT2 Dry Contact2 16 VCC Communication VCC 12V power supply PIN5 and PIN6 are used for meter communication the electricity meter is shown in the fig 4 11 PIN5 and PIN6 correspond to ...

Page 33: ...HYD 5 20KTL 3PH User manual Copyright Shenzhen SOFARSOLAR Co Ltd 28 4 6 4 Link Port 0 1 Cascade communication interface Fig 4 12 Link Port ...

Page 34: ...nt of the LOAD current diverted to each machine is nearly equal 3 When the total power of AC Load is greater than 110 of the rated power of the machine For example one 20KW machine AC LOAD has a maximum allowable power of 22kVA and five parallel machines AC LOAD has a maximum allowable power of 110kVA the Load should not be connected to AC Load and should be connected to AC Grid Fig 4 13 parallel ...

Page 35: ...t_R The current sensor outputs a positive electrode 3 Ict_S The current sensor outputs a negative electrode Used to connect S phase current sensor of power grid 4 Ict_S The current sensor outputs a positive electrode 5 Ict_T The current sensor outputs a negative electrode Used to connect T phase current sensor of power grid 6 Ict_T The current sensor outputs a positive electrode Fig 4 14 CT interf...

Page 36: ...o situations when CT is installed One is to connect in the correct CT direction The direction should refer to the figure below from the inverter to the power grid One is the random CT direction and then the use of CT calibration function for calibration CT calibration procedures refer to this manual 6 3 2 8 CT calibration ...

Page 37: ...HYD 5 20KTL 3PH User manual Copyright Shenzhen SOFARSOLAR Co Ltd 32 Fig 4 16 Electrical connections Plan B Meter CT ...

Page 38: ...e adapter to the computer NOTE The length of the RS485 communication cable should be less than 1000 m Fig 4 17 2 WiFi GPRS Refer to the figure shown below Fig 4 18 The operation information generated energy alert operation status of the inverter can be transferred to PC or uploaded to the server via WiFi GPRSUsers can choose to use web or APP for monitoring and viewing according to their needs The...

Page 39: ...s doc solarmanpv com web 14 B Communication between multiple inverters 1 RS485 RS485 wires are connected in parallel between inverters Connect the RS485 and RS485 of the inverter to the TX and TX of the RS485 USB adapter connect the USB port of the adapter to the computer NOTE When multiple inverters are connected via RS485 wires set communication address to differentiate the inverters please refe...

Page 40: ...n or enter the main interface press Up to the upper menu option or value plus 1 press Down to the lower menu option or value minus 1 Press OK to select the current menu option or switch to the next digit 5 2 Indicator lights and status Status On Grid Green light Off Grid Green light Alarm Red light On grid ON Standby On Grid Flashing Off Grid ON Standby Off Grid Flashing Alarm ON ...

Page 41: ...ircuit breaker is correctly connected between inverter LOAD port critical load circuit breaker OFF 8 For lithium battery please ensure that the communication cable has been correctly connected 9 For the lead acid battery please ensure that the NTC wire has been correctly connected 6 2 First Time Setup IMPORTANT IMPORTANT Please follow the following procedure to switch ON inverter 1 Make sure there...

Page 42: ... 00 00 Germany VDE4105 18 00 EU EN50438 01 Germany BDEW 01 EU EN50549 02 Germany VDE0126 19 00 IEC EN61727 01 00 Italia CEI 021 Internal 20 00 Korea 01 Italia CEI 016 Italia 21 00 Sweden 02 Italia CEI 021 External 22 00 Europe General 03 Italia CEI0 21 In Areti 24 00 Cyprus 02 00 Australia 25 00 India 01 Australia AU WA 26 00 Philippines 02 Australia AU SA 27 00 New Zealand 03 Australia AU VIC 28 ...

Page 43: ... selection 5 Set battery parameters Take the default input channel configuration as an example Start with battery 1 and work your way up to battery n Battery Type Type of band communication protocol Lead acid or no protocol type 1 Battery Address 1 Battery Capacity 2 Battery Charge Current Limit 2 Battery Nominal Voltage 3 Battery Discharge Current Limit 3 Battery Cell Type 4 Battery DOD EOD 4 Bat...

Page 44: ...id V T V AC Current R A AC Current S A Down AC Current T A Frequency Hz Battery Information 1 Batt1 V V Batt1 Curr A Batt1 Power KW Batt1 Temp Batt1 SOC Batt1 SOH Down Batt1 Cycles T Battery Information 2 Batt2 V V Batt2 Curr A Batt2 Power KW Batt2 Temp Batt2 SOC Batt2 SOH Batt2 Cycles T In the main interface press UP button to enter PV parameters page Main interface Up PV Informatioon PV1 Voltage...

Page 45: ... Update 6 3 1 System setting 1 System Setting OK 1 Language Settings 2 Time 3 Safety Param 4 Energy Storage Mode 5 Auto Test Only for Italy 6 Input Channel Config 7 EPS Mode 8 Communication Addr 1 Language Settings Used to set the menu display language 1 Language Settings OK 1 中文 OK 2 English 3 Italiano 4 2 Time Set the system time for the inverter 2 Time OK Time 2020 05 13 17 07 00 3 Safety Param...

Page 46: ...lf use mode inverter will automatically charge discharge the battery 1 If PV generation LOAD consumption ΔP 100W inverter won t charge or discharge the battery 2 If PV generation LOAD consumption the surplus power will be stored in the battery 3 If the battery is full or already at Max Charge Power excess power will be exported to the grid 4 If PV generation LOAD consumption it will discharge the ...

Page 47: ...f your PV system can produce more electricity than your home electricity consumption Then you don t need to set an off peak charge period to charge your battery in summer at all You can select an effective date normally winter for Time of use mode in this case Outside the effective date inverter is working in Auto Mode You can set multiple Time of use rules to meet your more complex requirement Ri...

Page 48: ... communication protocol 5 Auto Test ONLY for Italian Market 5 Auto Test OK 1 Autotest Fast 2 Autotest STD Autotest Fast 1 Autotest Fast OK Start Autotest Press Ok to start Testing 59 S1 Wait Test 59 S1 OK Wait Testing 59 S2 Wait Test 59 S2 OK Wait Testing 27 S1 Wait Test 27 S1 OK Wait Testing 27 S2 Wait Test 27 S2 OK Wait Testing 81 S1 Wait Test 81 S1 OK Wait Testing 81 S2 Wait Test 81 S2 OK Wait ...

Page 49: ... Press Down 27 S2 threshold 92V 200ms Press Down 27 S2 227V 205ms Press Down 81 S1 threshold 50 5Hz 100ms Press Down 81 S1 49 9Hz 103ms Press Down 81 S2 threshold 51 5Hz 100ms Press Down 81 S2 49 9Hz 107ms Press Down 81 S1 threshold 49 5Hz 100ms Press Down 81 S1 50 0Hz 105ms Press Down 81 S2 threshold 47 5Hz 100ms Press Down 81 S2 50 1Hz 107ms Autotest STD 2 Autotest STD Press OK to start The test...

Page 50: ... 2 Disable Input Channel4 PV input 1 Down PV input 2 Disable 7 EPS Mode 7 EPS Mode OK 1 EPS Mode Control OK 1 Enable EPS Mode OK 2 Disable EPS Mode 1 If PV generation LOAD consumption ΔP 100W inverter will charge battery 2 If PV generation LOAD consumption inverter wont charge or discharge battery 3 If PV generation LOAD consumption ΔP 100W inverter will discharge battery 4 If PV generation is nor...

Page 51: ... Battery Parameter OK 1 Battery Type 5 Max Charge A 2 Battery Capacity 6 Max Discharge A 3 Nominol Bat Voltage 7 Discharg Depth 4 Battery Cell Type 8 Save OK B PYLON SOFAR 1 Battery Parameter OK 1 Battery Type 4 Max Discharge A 2 Battery Address 5 Discharg Depth 3 Max Charge A 6 Save OK Depth of Discharge For example if Discharge Depth 50 EPS Discharge Depth 80 While grid is connected Inverter won...

Page 52: ...or make inverter to perform a scan right away 3 IV Curve Scan OK 1 Scan Control OK Enable Disable 2 Scan Period OK min 3 Force Scan OK 4 Logic interface Control Enable or disable logical interfaces Please refer to this manual 4 6 2 inverter logic interface connection for details 4 Logic interface Control OK Enable OK Disable OK 5 Factory Reset 5 Factory Reset OK 1 Clear Energy Data OK 2 Clear Even...

Page 53: ...cannot be repeated NOTE The parallel address is different from the communication address used for monitoring 4 Save Save after the setup is complete 7 Bluetooth Reset 7 Bluetooth Reset OK Please confirm OK Success 8 CT Calibration To calibrate the direction and phase of the CT the battery should be charged or discharged when using this function 8 CT Calibration OK Calibrating Sucess Fault Check if...

Page 54: ...Inverter Info 2 Battery Info 3 Safety Param 1 Inverter Info OK Inverter Info 1 Product SN Software Version Main DSP Software Version Slave DSP Software Version Down Inverter Info 2 Hardware Version Power Level Country Down Inverter Info 3 Input Channel1 Input Channel2 Input Channel3 Input Channel4 Down Inverter Info 4 Energy Storage Mode RS485 Address EPS Mode IV Curve Scan Down Inverter Info 5 Lo...

Page 55: ...ber of events and each specific ID No and happening time User can enter Event List interface through main interface to check details of real time event records Event will be listed by the happening time and recent events will be listed in the front 5 Event List OK 1 Current Event List OK ID042 IsoFault 2 History Event List 2 Battery Info OK Battery1 2 info 1 Battery Type Battery Capacity Over V Pr...

Page 56: ...original file in usb flash drive Step 4 Insert the usb flash drive into the USB Wifi interface Step 5 Then turn on DC switch Step 6 6 Software Update OK Input password OK Input 0715 Start Update Updating DSP1 Updating DSP2 Updating ARM Step 7 If the following errors occur please upgrade again If this continues many times contact technical support for help USB Fault MDSP File Error SDSP File Error ...

Page 57: ...nd output connections and wiring in good condition Are the configuration settings correct for the particular installation Are the display panel and the communication cables properly connected and undamaged Follow the steps below to view recorded problems Press Back to enter the main menu in the normal interface In the interface screen select Event List then press OK to enter events Earth Fault Ala...

Page 58: ...ccurs repeatedly contact technical support to change the grid over voltage under voltage over frequency under frequency protection points after obtaining approval from the local electrical grid operator ID002 GridUVP The grid voltage is too low ID003 GridOFP The grid frequency is too high ID004 GridUFP The grid frequency is too low ID005 GFCI Charge Leakage Fault Internal faults of inverter switch...

Page 59: ...21 GFCIDeviceFault DC Leakage current sampling error DC ID022 GFCIDeviceFault AC Leakage current sampling error AC ID023 HwADFaultDCV Error in dc component sampling of load voltage ID024 HwADFaultIdc Dc input current sampling error ID029 ConsistentFault_ GFCI Leakage current consistency error ID030 ConsistentFault_ Vgrid Grid voltage consistency error ID033 SpiCommFault D C SPI communication error...

Page 60: ...attery temperature protection Make sure the inverter is installed where there is no direct sunlight Please ensure that the inverter is installed in a cool well ventilated place Ensure the inverter is installed vertically and the ambient temperature is below the inverter temperature limit ID050 TempFault_Heat Sink1 Radiator 1 temperature protection ID051 TempFault_Heat Sink2 Radiator 2 temperature ...

Page 61: ...series voltage Voc is higher than the maximum input voltage of the inverter If so adjust the number of PV modules in series and reduce the PV series voltage to fit the input voltage range of the inverter After correction the inverter will automatically return to its normal state ID070 BatOVP Battery over voltage Check whether the battery overvoltage setting is inconsistent with the battery specifi...

Page 62: ...Unbalance Unbalanced output current ID097 HwLLCBusOVP LLC bus hardware overvoltage ID098 HwBusOVP Inverter bus hardware overvoltage ID099 HwBuckBoostO CP BuckBoost hardware overflows ID100 HwBatOCP Battery hardware overflows ID102 HwPVOCP PV hardware overflows ID103 HwACOCP Ac output hardware overflows ID110 Overload1 Overload protection 1 Please check whether the inverter is operating under overl...

Page 63: ... larm Battery low voltage protection Please check whether the battery voltage of the inverter is too low ID125 BatLowVoltageS hut Battery low voltage shutdown ID129 unrecoverHwAc OCP Output hardware overcurrent permanent failure Internal faults of inverter switch OFF inverter wait for 5 minutes then switch ON inverter Check whether the problem is solved If no please contact technical support ID130...

Page 64: ...layF ail Permanent relay failure ID141 unrecoverVbusU nbalance Bus voltage unbalanced permanent failure ID145 USBFault USB fault Check the USB port of the inverter ID146 WifiFault Wifi fault Check the Wifi port of the inverter ID147 BluetoothFault Bluetooth fault Check the bluetooth connection of the inverter ID148 RTCFault RTC clock failure Internal faults of inverter switch OFF inverter wait for...

Page 65: ...uction ID166 LogicInterfaceDe rating Logic interface derating The inverter is loaded by the execution logic interface ID167 AlarmAntiReflux ing Anti reflux derating The inverter is implemented to prevent countercurrent load drop ID169 FanFault1 Fan 1 fault Please check whether the fan 1 of inverter is running normally ID170 FanFault2 Fan 2fault Please check whether the fan 2 of inverter is running...

Page 66: ...cked by dust dirt or any other items Before the cleaning make sure that the DC SWITCH is turned OFF and the circuit breaker between inverter and electrical grid is turned OFF Wait at least for 5 minutes before the Cleaning Inverter cleaning Please clean the inverter with an air blower a dry soft cloth or a soft bristle brush Do NOT clean the inverter with water corrosive chemicals detergent etc He...

Page 67: ...of battery input 1 2 Battery voltage range 180V 800V Battery voltage range for full load V 200 800 240 800 320 800 200 800 300 800 400 800 Nominal charging dischargin g power W 5000 6000 8000 10000 15000 20000 Max charging dischargin g current 25A 50A 25A 25A Peak charging dischargin g current Duration 40A 60s 70A 35A 35A 60s Charging strategy Follow BMS Battery capacity 25Ah 100Ah Communication i...

Page 68: ... 7500 6000 6000 9000 6600 6600 12000 6600 6600 15000 7500 7500 22500 11250 11250 30000 15000 15000 Max DC voltage 1000V Start up voltage 200V MPPT voltage range 180 960V Rated DC voltage 600V No of MPP trackers 2 No of strings per MPP tracker 1 2 Full power MPPT voltage range V 250 850 320 850 360 850 220 850 350 850 450 850 Max Input current 12 5A 12 5A 25A 25A Max short circuit current 15A 15A 3...

Page 69: ...ty grid VA 5500 6600 8800 11000 16500 22000 Max AC power from utility grid VA 10000 12000 16000 20000 30000 40000 Max AC current output to utility grid 8A 10A 13A 16A 24A 32A Max AC Current from utility grid 15A 17A 24A 29A 44A 58A Nominal grid voltage 3 N PE 220 380Vac 230 400Vac Grid voltage range 184Vac 276Vac Nominal grid freqency 50Hz 60Hz Grid freqency range 45Hz 55Hz 55Hz 65Hz Output power ...

Page 70: ... 10000 15000 20000 Max output power VA 5500 6600 8800 11000 16500 22000 Peak output power Duration 10000V A 60s 12000V A 60s 16000V A 60s 20000V A 60s 22000V A 60s 22000V A 60s Max output current 8A 10A 13A 16A 24A 32A Peak output current Duration 15A 60s 18A 60s 24A 60s 30A 60s 32A 60s 32A 60s Nominal output voltage 3 N PE 220 380Vac 230 400Vac Nominal output freqency 50 60Hz Output THDv Liner lo...

Page 71: ...ncy 97 5 97 5 97 5 97 7 97 7 97 7 Max efficiency 98 0 98 0 98 0 98 2 98 2 98 2 Max battery charge discharge efficiency 97 6 97 6 97 6 97 8 97 8 97 8 DC switch Yes PV reverse polarity protection Yes Output over current protection Yes Output over voltage protection Yes Anti islanding protection Yes Residual current detection Yes Insulation resistor detection Yes Surge protection level II Battery rev...

Page 72: ...H HYD 8KTL 3PH HYD 10KTL 3PH HYD 15KTL 3PH HYD 20KTL 3PH Dimension 571 4mm 515mm 264 1mm Weight 33kg 37kg Inverter topology Transformerless Standby self consumption 15W Operating temperature range 30 60 Relative humidity 0 100 Noise 45dB Operating altitude 4000m Cooling Natural Forced airflow Protection degree IP65 ...

Page 73: ...k up AC terminal 5P Connector Display LCD Display Monitoring interfaces Bluetooth RS485 WIFI GPRS optional Parallel operation Yes Standard warranty Standard 5 years Grid AS NZS 4777 VDE V 0124 100 V0126 1 1 VDE AR N 4105 CEI 0 21 CEI 0 16 EN50438 EN50549 G83 G59 G98 G99 UTE C15 712 1 UNE206 007 1 Safety IEC62109 1 IEC62109 2 NB T32004 IEC62040 1 EMC EN61000 1 EN61000 2 EN61000 3 EN61000 4 EN61000 ...

Page 74: ... the company s sales team by providing the product serial number Our company may refuse to do not conform to the time limit extended warranty purchase application Customers can buy an extended warranty of 5 10 15 years If the customer wants to apply for the extended warranty service please contact the sales team of our company to purchase the products that are beyond the purchase period of extende...

Page 75: ...such as container package unloading 9 Failure to follow the product user manual installation manual and maintenance guidelines 10 Improper use or misuse of the device 11 Poor ventilation of the device 12 The product maintenance process does not follow relevant standards 13 Failure or damage caused by natural disasters or other force majeure such as earthquake lightning strike aware fire etc Statem...

Page 76: ...gDa Industrial Park District 68 XingDong Community XinAn Street BaoAn District Shenzhen GuangDong P R China Email service sofarsolar com Tel 0510 6690 2300 Web www sofarsolar com Product Name Energy storage integrated inverter ...