SOFAR 3.3~12KTLX-G3
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd.
- 13 -
3.Installation
Outlines of this Chapter
This topic describes how to install this product, please read carefully before
install.
Do NOT install the product on flammable material
Do NOT store this product in potentially explosive atmospheres
Dangers
The enclosure and heat sink will get hot during operation,
please do not mount the product at a easy to reach location
Caution
Consider the weight of this product when doing transport and
moving
Choose an appropriate mounting position and surface
At least two persons for installation
Attention
3.1. Installation Process
3.2. Checking Before Installation
Checking Outer Packing Materials
Before unpacking, please check the condition of the outer package materials if
any damaged found, such as holes, cracks, please not unpack the product,
contact your distributor immediately. Recommend installing the product within
24 hours after unpacking the package.