SOFAR 7.5KTLM
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 12 -
Therefore, check the outer packing materials before installing the inverter. Check
the outer packing materials for damage, such as holes and cracks. If any damage is
found, do not unpack the SOFAR 7.5KTLM and contact the dealer as soon as
possible. You are advised to remove the packing materials within 24 hours before
installing the SOFAR 7.5KTLM inverter.
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and
complete. If any damage is found or any component is missing, contact the dealer.
Table 3-1 shows the components and mechanical parts that should be delivered.
NO.
Picture
Description
Quantity
1
7.5KTLM
1pcs
2
Rear panel
1pcs
3
PV+ input terminal
3pcs
4
PV- input terminal
3pcs
5
Metal terminals secured
to PV+ input power cables
3pcs
6
Metal terminals secured
to PV- input power cables
3pcs