UPS/NTA GB/DELMP_EXPC1C3C6_B
41
5.2.4 Battery
The battery test is for controlling the battery capacity to supply energy. The battery test can
either be made manually or automatically.
5.2.4.1
Battery test information
This menu provides information to show:
-
the result of the latest battery test (OK, failed or aborted),
-
date and time of the latest battery test,
-
date and time of the next battery test. If the test is not scheduled, "----" is
displayed instead of the date.
5.2.4.2 Test
programming
The battery test can be made automatic from the control panel by setting the
frequency, the day of the week and the time.
BATTERY: BATTERY TEST PROGRAMMING
BATTERY TEST:
inactive
PROGRAMMED ON: Friday at 20:00
EVERY:
8
weeks
5.2.4.3 Battery
measurements
The following measurements can be displayed:
- Battery
voltage,
-
Battery current (minus sign in front of the value means the battery is
discharging)
- Battery
temperature,
- Load
rate.
BATTERY MEASUREMENTS
Vdc = 450 V
I batt = - 56 A
Load rate :
Summary of Contents for DELPHYS MP
Page 6: ...UPS NTA GB DELMP_EXPC1C3C6_B 5 CHAPTER 1 GENERAL...
Page 10: ...UPS NTA GB DELMP_EXPC1C3C6_B 9 CHAPTER 2 SINGLE UNITS WITH BYPASS...
Page 17: ...UPS NTA GB DELMP_EXPC1C3C6_B 16 CHAPTER 3 MODULAR SYSTEMS...
Page 29: ...UPS NTA GB DELMP_EXPC1C3C6_B 28 CHAPTER 4 CENTRAL BYPASS SYSTEMS...
Page 39: ...UPS NTA GB DELMP_EXPC1C3C6_B 38 CHAPTER 5 DESCRIPTION OF THE MENUS...