12
Chute Crank Rod Assembly
1. Slide the chute crank rod through the hole on the chute
rod retainer located on the middle handle frame (Fig. 12).
2. Insert it into the opening at the back of the housing with
holes aligned (Fig. 13).
3. Secure the crank rod in place with the cotter pin (Fig. 14).
Operation
m
WARNING!
Keep the area to be cleared free of stones,
toys or other foreign objects that the rotor blades might pick
up and throw. Such items could be covered by snow and are
easy to overlook, so be sure to conduct a thorough inspection
of the area before beginning work.
St Stopping
1. Open the battery compartment cover and slide each
battery down until it clicks to lock it into position (Fig. 15).
2. While depressing the safety switch button, pull the
ON/OFF trigger toward you. Once the machine powers on,
release the safety switch button and begin operation
(Fig. 16). The machine can only be started by depressing
the safety switch button first, followed by squeezing
the ON/OFF trigger; reverse operation will not start the
machine.
3. To power off, release your grip on the ON/OFF trigger.
Fig. 12
Chute
crank rod
Chute
crank rod
retainer
Middle
handle frame
Fig. 13
Align the holes
The opening
Fig. 14
Cotter pin
Fig. 15
Battery
compartment
cover
Battery packs
Fig. 16
Safety switch
button
1
2
On/Off trigger