500Z 26HP - 48” Mower Deck
1/2008
7
TP 300-7368-IR-ZT-N
Check Deck Rod Timing
1. Park machine on a flat, level surface. Disengage the
PTO, stop the engine and engage the parking brake.
Rear tires must be inflated to 15 psi (1,03 bar); front
tires to 40 psi (2,76 bar).
2. To check the lift rod timing, measure and record the
distance between the lift pivots and the rod pivots.
Repeat for the other side of the machine. See Figure
8.
3. If the measurements for the rods are equal, no
further adjustment is required. If the measurements
are NOT equal (greater than 1/8” (3,17mm)
difference), adjustment is required, continue with
Step 5.
4. Lock the deck lift pedal in the 4-1/2” (11,47cm)
position. Remove the cutting height adjustment pin
and lower the mower deck.
5. To ensure that the deck is in the lowest position,
push the pedal by hand towards the rear of the
machine and install the height adjustment pin in the
3” (7.6cm) position to hold in place.
6. Block up the mower deck until all hanger chains are
slack.
7. See Figure 9. To adjust the lift rod, loosen the jam
nut on the clevis then remove the 1/2” clevis pin
fastening the clevis the the lift pivot arm. Turn the
clevis clockwise to shorten the distance between the
rod pivots or counterclockwise to lengthen the
distance between the rod pivots. Reinstall the clevis
on the lift pivot arm and secure with the 1/2” clevis
pin previously removed. Tighten the jam nut against
the clevis.
8. Remove the blocks from under the mower deck.
9. Remove the the cutting height adjustment pin from in
front of the deck lift pedal arm. Lift the mower deck
and reinstall the adjustment pin in the desired
mowing height.
Figure 8. Check Lift Rod Timing
Figure 9. Adjust Lift Rod Timing