![SnapPad EQ Round Installation Instructions Download Page 4](http://html1.mh-extra.com/html/snappad/eq-round/eq-round_installation-instructions_1307520004.webp)
SnapPad EQ Round
Info & Statistics
• Dimensions: 11.75” wide x 2.00” thick.
• Once installed they add about an inch to your jack thickness.
• 5.6 pounds per pad.
• You’re helping our environment! SnapPads are made from American recycled tires. That means
SnapPads are not only durable and versatile but environmentally friendly too.
• Will work on any type of surface, level or unlevel, including: asphalt, concrete, grass, mud, sand, resin,
ice, and snow.
• Scientifically tested to maintain integrity at over 120°F down to -40°F and remain attached at over 50x
the force of gravity.
• Generally, it takes 1,300 pounds of vertical pressure to install your SnapPads. This ensures no matter
how far o
ff
the beaten path you venture, your SnapPads will be there with you.
• Proudly made in the USA.
• It’s best (and easiest) to install your SnapPads one at a time on a level, hard surface.
• Each leveling system will have it’s own manual operation function. Please refer to your owners manual for specific directions.
• Grab a helper! It's safer, faster, and more e
ff
icient with two people.
• Use your phone or another person to relay the information between the installer and the person working the controls.
• Install each SnapPad individually and visually confirm the reinforced lip has engaged on the complete diameter. It is critical your SnapPad has been installed fully and
correctly.
• Standing water? No problem! Your SnapPad EQ Round pads have built-in drainage channels.
• Your SnapPads come with a handy bolt-access hole in the center. You can use this to remove the jack with the SnapPad still attached if needed.
• Installation is easier in warm weather (50°F or more).
While not required, we recommend double protecting your jacks by covering the landing feet with a rubberized protectant such as Flex Seal®. Make sure to cover your jack
cylinders prior to applying and coat the bottom of your landing feet as well. Do this prior to installing your SnapPads and allow the protectant to cure for 24 hours. Do not
spray your SnapPads with the sealant (it will not adhere to the rubber).
HELPFUL HINTS & TRICKS FOR EQ ROUND
EQ ROUND INSTALLATION INSTRUCTIONS
RV SNAPPAD 03