background image

Motorhome Detailed Installation Instructions

EQ ROUND INSTALLATION INSTRUCTIONS

RV SNAPPAD 02

INSTALLATION TIME: 3 - 6 MINUTES PER PAD.

•  SnapPad installation is best performed on a level or near level surface – preferably a hard surface (concrete or asphalt). Wheel chocks 

can be placed in front of and behind the RV wheels for additional safety.

•  Be sure to thoroughly clean and dry your landing feet prior to installing your SnapPads.

•  Spread a small bead of concentrated dish soap around the lip of the SnapPad and metal landing foot to aid installation. 

Do NOT use 

any petroleum based lubricant, such as WD-40®, as it may negatively react with the binder in your SnapPads.

•  Most motorhomes will release their airbags prior to engaging the jacks. This will lower the entire RV at the beginning of the leveling 

process. You may place your first SnapPad prior to this, however, 

be careful to not get caught underneath your RV during the 

lowering process!

•  Typically one side will level first. Take note which side that is and start there. Install one SnapPad at a time and/or use the manual 

jack operation if possible. Refer to your owners manual for instructions.

•  Most jacks are 18”- 24” under your RV. A tool such as a broomstick to align/adjust your SnapPads may be necessary.

•  Once aligned, begin lowering your jack. Keep an eye on the landing foot as it extends. Stop extending when the foot is about 2 to 3 

inches from the SnapPad. Double check to make sure it is centered, re-align if necessary and then continue extending the landing 

gear to complete installation. 

KEEP YOUR FINGERS AND ANY FOREIGN OBJECTS CLEAR WHEN LOWERING THE  

JACK INTO PLACE.

•  You should hear a distinctive “snap” as the lip engages. Visually confirm the lip is fully engaged around the perimeter of the landing 

foot.

•  If your lip hasn’t fully engaged raise your jack and place a shim (small piece of wood no thicker than 1/4”) under the side that hasn’t 

engaged. Lower your jack again until that side snaps into place.

•  Wipe o

ff

 any excess soap and repeat the installation process, in sequence, on your remaining jacks.

INSTALLATION TIME: 3 - 6 MINUTES PER PAD.

Summary of Contents for EQ Round

Page 1: ...RV SNAPPAD EQ ROUND INSTALLATION INSTRUCTIONS 1 866 923 9538 INFO RVSNAPPAD COM RVSNAPPAD COM 4E EQ0SP4 ...

Page 2: ...to installing your SnapPads Permanent damage could result from trying to install on the wrong landing foot resulting in your warranty being voided Your EQ Round pads are designed to work with 10 round jack feet that are commonly found on Equalizer leveling systems Trademark is owned by mark owner SnapPad and its goods are not affiliated with or endorsed by the mark owner The SnapPad for the 10 rou...

Page 3: ... one side will level first Take note which side that is and start there Install one SnapPad at a time and or use the manual jack operation if possible Refer to your owners manual for instructions Most jacks are 18 24 under your RV A tool such as a broomstick to align adjust your SnapPads may be necessary Once aligned begin lowering your jack Keep an eye on the landing foot as it extends Stop exten...

Page 4: ...cific directions Grab a helper It s safer faster and more efficient with two people Use your phone or another person to relay the information between the installer and the person working the controls Install each SnapPad individually and visually confirm the reinforced lip has engaged on the complete diameter It is critical your SnapPad has been installed fully and correctly Standing water No prob...

Page 5: ...er Amazon or other online source we encourage you to contact them for your replacement refund CONDITIONS SnapPads are an aftermarket RV accessory and as such it is the responsibility of the RV owner to ensure they are an appropriate and safe addition to their RV Each RV has unique design considerations It is the responsibility of the RV owner to confirm their SnapPads have adequate clearance for a...

Reviews: