background image

2

ASSEMBLY

For Model YA704B (see Figure 3 on
page 5):

Note:

 From step 1 to step 4. Hand

tighten bolts and locknuts only.

1. Attach six casters (# 1) to base frame

(# 31) and the two legs (# 32) using
bolts and locknuts (# 2 & 3).

2. Attach two legs (# 32) to base frame

(# 31) using bolt and locknut (# 5)
then install locking pin and retaining
clip (# 4).

3.  Attach the upright (# 9) to the base

frame (# 31) with bolts and locknuts
(# 8).

4. Attach the two braces (# 7) to base

frame (# 31) and upright (# 9) with
bolts and nuts (# 6, # 10 & 11).

Note:

 The upright must lean toward  the

rear of the base frame as shown.

5. Tighten bolts between upright (# 9),

base frame (# 31), and braces (# 7).

6. Attach the mounting plate (# 13)

between mounting ears on upright (#
9) using bolt and nut (# 12 and # 14)

7. Attach hydraulic unit (# 17) to the

mounting base (# 13) using bolts
and nuts ( # 15 and # 16).

8. Attach boom (# 19) to upright (# 9)

using bolt and locknut (# 18 and #
20).

9. Hold boom (# 19) and pivot hydraulic

unit (# 17) out away from upright (# 9)
and position ram between mounting
brackets on boom(# 19). Attach
hydraulic unit (# 17) to boom (# 19)
with bolt, spacer and locknut (# 21,
22 & 23). Tighten nut.

10. Slide boom extension (# 27) into

boom and secure in retracted
position using bolt, washer and
locknut (# 24, 25 & 26). 3 positions
available: 1/2 ton, 3/4 ton,  and 1 ton.

11. Install chain/hook (# 30) to boom

extension (# 27) using bolt and
locknut (# 28 and # 29).

12. Make sure that all the bolts and nuts

are tightened before operating the
engine crane.

Note:

 Check all fasteners for tight-

ness, including those pre-assembled
at the factory. Tighten where required.

For Model YA705B (see Figure 4 on
page 5):

Note:

 Do not tighten any bolts unless

told to.

1. Attach the casters (# 1) to the exten-

sion legs (# 4) with bolts and lock-
nuts (# 2 and # 3).

2. Slide the extension legs (# 4) into the

base frame (# 5), and secure with
bolts (# 6).

3. Attach the two braces (# 7) to base

frame (# 5) using 2 bolts and nuts (#
8).

4. Attach the upright (# 9) to the base

frame (# 5) using bolts and locknuts
(# 10).

Note:

 The upright must lean toward the

rear of the base frame as shown in
Figure 4.  Leave the bolts finger tight.

5. Attach the two braces (# 7) to the

upright (# 9) with bolts and nuts (#
11).

6. Tighten bolts between upright (# 9) to

base frame (# 5), and braces (# 7).

7. Attach the mounting plate (# 12)

between mounting ears on upright (#
9) using bolt and nut (# 16 and # 17).

8. Attach hydraulic power unit (# 13) to

the mounting base (# 12) using bolts
and nuts ( # 14 and # 15).

9. Attach boom (# 18) to upright (# 9)

using bolt and locknut (# 19 and #
20).

10. Hold boom (# 18) and pivot hydrau-

lic unit (# 13) out away from upright
(# 9) and position ram between
mounting brackets on boom(# 18).
Attach hydraulic unit (# 13) to boom
(# 18) with bolt, spacer and locknut
(# 21& #22). Tighten nut.

11. Slide boom extension (# 23) into

boom (# 18) and secure in retracted
position using bolt, washer and
locknut (# 24, 25 & 26). 4 positions
available: 4000 lbs (P1), 3000 lbs
(P2), 2000 lbs (P3), and 1000 lbs
(P4).

12. Install chain/hook (# 27) to boom

extension (# 23) using bolt and
locknut (# 28 and #29).

13. 

MAKE SURE 

that all the bolts and

locknuts are tighten before each
operation of the engine crane.

Note: 

Check all fasteners for tightness,

including those pre-assembled at the
factory. Tighten where required. Do not
load beyond rated capacity.

!

   WARNING

• Never extend leg extensions beyond

factory marked position on each
leg.

• Extend each leg extension an equal

distance from frame.

• Never fold crane with safety hook at-

tached to a load.

• Store folded crane with boom exten-

sion fully retracted.

• Move crane slowly and ONLY over

smooth, level surfaces.

• Failure to heed these markings may

result in personal injury and/or
property damage.

OPERATION

1. Ensure application is compatible with

product.

2. Secure engine to chain/sling hook

assembly, ensuring load is centered.

3. Follow vehicle service manual

recommendations to remove engine.
When ready to remove engine, turn
release valve clockwise until firm.
Pump handle until load is high
enough to clear vehicle.

4. Immediately upon removal and when

clear of the vehicle, lower the load to
the lowest practical position by
turning the release valve lever
counter-clockwise slowly and
carefully.

Note

: Avoid rolling the loaded engine

crane. To help position an engine stand
if necesary, move only across smooth,
level, seamless surfaces.

Before

 moving ensure the load:

a. is lowered to the lowest practical

position, but always below the center
of gravity.

b. is prevented from swinging and

inadvertent shifting.

5. Position a suitable engine stand near

the removed engine, then immedi-
ately transfer the load to appropriate
engine support device (engine
stand). Check to ensure stand is
secure before working on or around
the load.

!

   WARNING

To reduce the risk of personal injury
and property damage, NEVER extend
boom extension beyond leg exten-
sion. Never work under loaded crane
or engine stand.

Summary of Contents for YA704B

Page 1: ...nts and rec ognize the potential hazards associated with its use before using this product Study understand and follow all instructions provided with and on this device before operating this device Do...

Page 2: ...ulic power unit 13 to the mounting base 12 using bolts and nuts 14 and 15 9 Attach boom 18 to upright 9 using bolt and locknut 19 and 20 10 Hold boom 18 and pivot hydrau lic unit 13 out away from upri...

Page 3: ...ng oil to pivot points axles and hinges will help to prevent rust and assure that casters and pump assemblies move freely Cleaning Periodically check the pump piston and ram for signs of rust or corro...

Page 4: ...59 65 32 35 1 4000 lbs 77 51 2 3000 lbs 84 60 3 2000 lbs 90 69 4 1000 lbs 97 78 30 Retracted 36 Extended Legs Up 25 64 39 Legs Down 64 YA704B Figure 1 Model YA704B Components YA705B not Shown Handle...

Page 5: ...8 21 and 22 5 8 x 2 1 2 5 8 24 25 and 26 1 2 x 3 1 2 1 2 28 and 29 1 2 x 3 1 2 Size of Bolts and Locknuts Figure 4 Assembly Illustration for Model YA705B Item No 2 and 3 5 16 x 3 4 5 16 5 1 2 x 4 1 2...

Page 6: ...p on Tools Company Kenosha WI 53141 1410 Figure 5 Replacement Parts for Model YA704B Replacement Parts for Model YA704B Item No Part No Description 1 248817 Caster 2 248818 Boom Extension 3 248761 Cha...

Page 7: ...are Kit Description Qty 5 8 x 4 Hex Head Bolt 1 5 8 x 4 Hex Head Bolt 1 5 8 x 2 Hex Head Bolt 1 5 8 x 2 Hex Head Bolt 1 x 4 Hex Head Bolts 3 3 8 x 1 Hex Head Bolts 2 x 3 Hex Head Bolt 1 x 1 Hex Head B...

Page 8: ...product fails due to material or workman ship defect within the warranty period you may contact your retailer for disposition or you may contact an Authorized Service Center listed in the product owne...

Reviews: