www.smoothfitness.co.uk
17
ASSEMBLY
STEP 2
:
Assemble the Pedal Arm – Right
(A) Slide the Bolt 20x91--M14x25mm (# 703) with Wave Washer
20.7x29.1x0.3mm (# 706) through the Pedal Arm – Right(# 104) and Action
Handlebar – Right (# 106) then secure using one M14 Nut (# 704).
703
X1
704
X1
706
X1
C
E
D
703
104
704
106
706