8
Service
SERVICE CHART
Before servicing or making adjustments to the machine, stop engine, set park break, block
wheels and remove key from ignition.
Follow all procedures and ONLY use parts prescribed by the manufacturer. Read the engine
manual before maintenance.
C=Check or Clean at specified intervals
R=Replace at specified intervals
* Tire pressure: Machine Tires 18 psi (1.3 bar) Castor Wheels 20 psi (1.4 bar)
† Replace hydraulic filter after the first 20, 100, and every 250 there after.
§ Torque tire nuts after the first 10 hours and every 200 hours there after (64 to 74 ft/lb (87-100 Nm))
¤ Kawasaki change oil after first 8 hours.
£ Change oil every 25 hours when operating under heavy load or in high ambient temperatures.
‡ Clean more often under dusty conditions or when airborne debris is present , replace air cleaner parts, if very dirty.
The suggested maintenance checklist is not offered as a replacement for the manufacturer’s engine manual but
as a supplement. You must adhere to the guidelines established by the manufacturer for warranty coverage. In
adverse conditions such as dirt, mud or extreme temperatures, maintenance should be more frequent.
Da
ily
A
s
R
equi
re
d
100 H
our
s
200 H
our
s
250 H
our
s
300 H
our
s
400 H
our
s
E
v
er
y 500 H
our
s/
Y
ear
ly
¤£ E ngine O il
C
R
R
R
R
R
R
E ngine O il Filter
R
R
R
E ngine for Leaks and Loos e P arts
C
C
C
C
C
C
‡ Air C leaner (P aper E lem ent)
R
C
C
R
C
R
‡ Air-C leaner (Foam E lem ent every 25 hours )
R
C
C
C
R
C
R
S park P lugs (C lean and Gap/R eplac e)
R
C
C
C
C
R
Valve C learanc e
C
Idle S peed
C
C
C
‡ C ooling S ys tem
C
C
C
C
C
C
B elts and Hos es
C
C
C
* Tire P res s ure
C
C
C
C
C
C
Vis ual Ins pec tion of Tires
C
C
C
C
C
C
Fuel Level
C
C
Fuel Filter
R
R
Hydraulic O il
C
C
C
C
C
R
†Hydraulic O il Filter
R
R
Hydraulic S ys tem for Leaks and Loos e Parts
C
C
C
C
C
C
B attery E lec trolyte Level
C
C
C
C
C
C lean B attery Term inals
C
C
§ Torque Lug Nuts
C
C
C
Lubric ate R eel and Blow er S haft B earings
C
C
C
C
C
C
Lubric ate C as tor W heels (E very 25 hrs )
C
C
Summary of Contents for BIG VAC 72-000-A
Page 14: ...12 Diagrams HYDRAULICDRAWING...
Page 16: ...14 Parts BIGVACMAINDRAWING...
Page 18: ...16 Parts CONTROLPANELDRAWING...
Page 20: ...18 Parts OILTANKDRAWING...
Page 22: ...20 Parts BLOWERHOUSINGDRAWING...
Page 24: ...22 Parts VACUUMHOUSING BELTSANDTENSIONERDRAWING...
Page 26: ...24 Parts HOPPERDRAWING...
Page 28: ...26 Parts 72 151HYDRAULICVALVEDRAWING...
Page 30: ...28 Parts 78 4163 BANKHYDRAULICVALVEDRAWING...
Page 32: ...30 Parts 72 048 AXLEDRAWING 72 202PTOSHAFTDRAWING...
Page 34: ...32 Accessories 72 001COMBINATIONSWEEPER VERTICUTHEADDRAWING...
Page 36: ...34 Accessories 72 001COMBINATIONSWEEPER VERTICUTHEADDRAWING...
Page 38: ...36 Accessories 72 001COMBINATIONSWEEPER VERTICUTREELDRAWING...
Page 40: ...38 Accessories 72 002 RUBBERFINGERSWEEPERHEADDRAWING...
Page 42: ...40 Accessories 72 002 RUBBERFINGERSWEEPERHEADDRAWING...
Page 44: ...42 Accessories 72 005 BRUSHREELSWEEPERHEADDRAWING...
Page 46: ...44 Accessories 72 005 BRUSHREELSWEEPERHEADDRAWING...
Page 48: ...46 Accessories 72 004OVER THE ROADTOWINGPACKAGEDRAWING...
Page 51: ...49 Accessories NOTES...
Page 52: ...50 Accessories 72 003HANDHELDVACUUMHOSEDRAWING FRONTVIEWHOLELOCATION...