
Issue/Rev. 0.7 (11/17)
Page 6
•
MN01045
Step 9.
a. Tighten T-Bar with the encoder attached
onto housing.
b. Tighten terminal block mounting bracket
screws.
Step 11.
a. Insert shaft down through the top and
through the encoder.
Note:
You may need to tap the shaft until it slides through completely.
b. Insert the cotter pin and tighten both set
screws.
Note:
Make sure that the torque arm is approximately 1/8" above
the T-bar base.
Note:
Ensure that the washer is between the cotter pin and the
housing. Apply a light coat of Loctite 222 (included) to the set screw
threads prior to tightening. Make certain to not over tighten the set
screws to avoid damage to the set screw heads, and the encoder.
Rotate the output shaft and check to ensure that the input shaft is
rotating as well.
Step 10.
Add thin coat of grease to shaft prior to
re-assembly.
9 8 7 6 5 4 3 2 1
Step 10
Step 11a
9 8 7 6 5 4 3 2 1
Step 11b
9 8 7 6 5 4 3 2 1
Step 9a
Step 9b
9 8 7 6 5 4 3 2 1
1/8"