3. Mount the UPT Transmitter onto the meter dome
adaptor. A weatherproof gasket and three 3/8" - 16 x
1-1/4" mounting bolts are provided. Care must be taken
to properly engage the transmitter coupling or gear to the
meter drive coupling or gear.
For adaptation to old style (single case) PD meter (old
style PD meters include Models AB, AS, B, or S-12, 13,
24, 28, 30, 35, 42, 45, 50, 60, 65, 75, and 100), also
mount the 5/8" spacer between the UPT Transmitter and
meter dome adaptor. An additional weatherproof gasket
and longer mounting bolts are provided.
4. If a live calibrator is required to be installed below the
UPT Transmitter then a UPT calibrator adapter kit is
required P/N 529288011. If a live calibrator is required on
top of the UPT Transmitter then a remote calibrator kit is
required P/N 529288001.
5. If additional stack accessories are not required, install a
blind cover plate (10078-1) on the top of the UPT Trans
-
mitter. The manual calibrator and other parts removed in
previous steps can be discarded (see note below).
6. If additional stack accessories are required, reinstall
the previously removed calibrator and stem assembly
into the new calibrator adaptor housing located on top
of the transmitter by reversing the removal procedure
described in Step 2 above (see note below).
7. Install oiler in calibrator housing (parts provided in the
adaptation kit):
a. Attach tube to oiler.
b. Insert tube through calibrator housing.
c. Drive oiler (force fit) into housing.
d. Attach oiler tube to top of calibrator, just below drive
coupling.
8. Reassemble the accessories (counter, mechanical tem
-
perature compensator, etc.) onto the calibrator housing.
9. Check the calibrator setting and adjust (if necessary) to
the setting recorded in Step 2b. Recalibration of the me
-
ter may be required due to breaking of seals on original
calibrator adjustment and is recommended to maintain
optimum meter accuracy.
For adaptation to old style PD meters, the meter must be
recalibrated because the new factory-installed calibrator
is not adjusted.
10.If desired, a seal wire can be installed (like a belt) around
the middle of the UPT Transmitter cover and housing to
prevent unauthorized tampering with internals.
Note:
With the calibrator removed from the meter, the oiler
fitting on the PD meter is no longer needed and should be
sealed off.
ATEX/IECEx Installation
Standards Used:
IEC 60079-0 6th Edition, EN 60079-0: 2012 +A11:2013,
UL 60079-0 6th Edition, CAN/CSA C22.2 No. 60079-0:11
IEC 60079-1 7th Edition, EN 60079-1: 2014. UL 60079-1
7th Edition, CAN/CSA C22.2 No. 60079-1:11
Cable entries must be in accordance to EN/IEC 60079-1
section 13.
For wiring systems utilizing cable glands the gland and or
thread adaptor must be Ex certified.
The cable end must be securely installed and depending
on the cable type be properly protected from mechanical
damage.
For wiring systems utilizing conduit, an Ex certified sealing
device must be used immediately at the entrance of the
enclosure. Any unused entry must be suitably blocked
with an Ex db IIB IP65 certified plug for ATEX and IECEx
applications.
Equipment bonding shall be provided at the external
grounding facility terminal, external connection is not
required when using metallic conduit or armored cable.
External grounding facility terminal wire range:
10-12 AWG (5.26 sq mm to 3.31 sq mm) wire.
CAUTION:
To prevent ignition of hazardous atmospheres,
disconnect from supply circuit before opening. Keep tightly
closed when circuits are in operation.
WARNING:
To prevent ignition of hazardous atmospheres,
do not open enclosure unless area is known to be non-
hazardous. To reduce the risk of ignition of hazardous
atmospheres, conduit runs must have a sealing fitting
connected within 18 inches of the enclosure.
Special Conditions For Safe Use:
- Special Fasteners: Cover Bolts - DIN 912 grade 12.9 (alloy
steel) M8 x 1.25, thread tolerance 6g, only replace with this
type.
- Select wiring and cable glands suitable for 80°C operation.
- Contact manufacturer at address listed for information on
the dimensions of the flameproof joints.
FMC Technologies Measurement Solutions Inc.
1602 Wagner Avenue
Erie, Pennsylvania 16510
USA
Marking
Equipment
Covered
Certificate
Ex db IIB T6
Tamb = -40°C to 70°C IP65
Model: UPT
DEMKO 03 ATEX 0308254X
IEC Ex UL 04.0009X