Smeg WO-20 Manual Use And Maintenance Download Page 11

 

 

7596040 – MANUALE WO-20 EN 21052018 REV.1 

- 11 - 

 

 

FUNCTIONING 

4.1 

FIRST START-UP 

WARNING 

 

The first start-up of the machine must be done by the installer. 
The installer checks the correct functioning of the machine. Before starting the system, 
carry out the conditioning procedure of the cartridge: with the conditioning tap open, 
open the tap upstream and wait 5 minutes 

 

Insert the power plug in a grounded socket 230V 50Hz equipped with efficient grounding. 
The machine is ready to operate. 
It’s recommended to do two cycles of filling/emptying to drain out the substances for the 
preservation of the membranes. 

 

Check for leaks from the hydraulic circuit. 

CONSIDER: for the complete filling of the presurized tank about 5 min are needed 

4.2 

NORMAL USE 

For normal use of the equipment it is necessary to keep the system always on and hydraulically powered. 
The system starts up automatically for each request to the tap. 
Every 6 hours, the machine automatically opens the inlet valve, so that the membranes are washed for 2 
minutes. 

4.3 

MIX - BY-PASS 

The mixing valve, installed on the back of the machine, allows to vary the produced water salinity: it uses the 
filtered water taken after the pump and it mixes it with the permeated water downstream of the 
membranes. The device must be calibrated in the installation phase. 
With WO-20, treated water retains about 10-15% of the original saline. 
In the event of a machine malfunction, this valve allows to exclude the osmosis system and to supply filtered 
water downstream. 

4.5 

LOW PRESSURE ALARM 

If low pressure alarm occurs, machine stops and makes three BEEP and display alarm. 
The machine restarts automatically after 1 minute. The min pressure switch is ignored for 20 seconds at 
machine start. 
If low pressure alarm repeats consecutive, the restart delay increases automatically. 
 

4.6 

LEACKAGE ALARM 

 

The machine has two leackage sensors inside. In chase of leackage, the machine makes a long BEEP and stop 

the machine. To restart the machine, disconnect and reconnect the power plug pressing the        button.

 

 

When the alarm is pre-set the card makes three BEEPs. 
 

WARNING 

 

The opening and the control of the anti-flooding probe must be done by qualified 
personnel (see §7). 

 

4.7 

INACTIVITY 

WARNING 

 

Absolutely avoid the membrane dehydration that would irreparably damage its 
functioning. 

 

We recommend that, whenever the unit remains stationary for a period of almost one 
week, let the water run for at least 10 minutes before to take water. 

 

For longer periods of stop it is recommended to follow the instructions given in the 
paragraph "set aside" (see §6.4.1). 

Summary of Contents for WO-20

Page 1: ...WO 20 Potable water treatment osmosis system for HO RE CA applications MANUAL use and maintenance...

Page 2: ...ar 2018 and subsequent 5 The object of the declaration described above is in conformity with the relevant Union harmonization legislation 2006 42 EU machines 2014 30 EU EMC 2014 35 EU LVD 2011 65 EU R...

Page 3: ...9 3 2 EXCHANGE OF DRAIN CAPILLARY 10 4 FUNCTIONING 11 4 1 FIRST START UP 11 4 2 NORMAL USE 11 4 3 MIX BY PASS 11 4 5 LOW PRESSURE ALARM 11 4 6 LEACKAGE ALARM 11 4 7 INACTIVITY 11 4 8 ELECTRONIC BOARD...

Page 4: ...own researches and spare parts requests please contact the manufacturer or a qualified service centre Read carefully the instructions for installation operation and maintenance before installing this...

Page 5: ...bed in this manual and they have not to perform tasks reserved to maintenance or qualified technician WARNING All extraordinary maintenance operations must be done by qualified personnel only 1 4 CARE...

Page 6: ...bsence of periodic maintenance IT IS STRICTLY FORBIDDEN to use the equipment in hygienic conditions or environments that aren t in compliance with those indicated in this manual IT IS STRICTLY FORBIDD...

Page 7: ...OGIC From the water inlet the water first goes through a prefiltration system to protect the membrane and put under pressure by the pump is presurated in the vessel containing the membrane The permeat...

Page 8: ...nic board F3 15A PERMEATE WATER SPECIFICATIONS Output maximum flow rate c a 120 Recovery percentage Vedi 3 2 WARNING The percentage of dissolved salts and other rejected elements is influenced by the...

Page 9: ...siphon Use new compliant washing tubes in compliance with EN61770 with diameter no less than DN10 Do not reuse old or worn pipes CHECKS TO DO BEFORE INSTALLATION Presence and efficiency of the ground...

Page 10: ...ater 1200 mS or 35 dH Maximum recovery rates refer to incoming water at 25 F pH 8 5 9 5 BLACK 55h WHITE 50h SOFTENER NEEDED 7 5 8 5 BLUE 60h WHITE 50h 60h 6 5 7 5 BLACK 55h WHITE 50h 0 6 F 6 15 F 15 2...

Page 11: ...nd it mixes it with the permeated water downstream of the membranes The device must be calibrated in the installation phase With WO 20 treated water retains about 10 15 of the original saline In the e...

Page 12: ...ton the software release is displayed It performs the flushing of the membranes for 2 minutes by opening the inlet solenoid valve It resets the hours of operation of the filter Confirm with It display...

Page 13: ...th the and buttons and confirm with the Select functioning by time or without time limit with the and buttons and confirm with the button Access the modification of the litres hour conversion paramete...

Page 14: ...ilter capacity has not been reached 5 1 TASKS OF MAINTENANCE PERSONNEL The ordinary maintenance plan described in this paragraph must be done according to the time indicated to keep the machine functi...

Page 15: ...original spare parts This maintenance must be documented in the appropriate space in the maintenance log see Annex III It is advisable to carry out an extraordinary maintenance at least once every 6...

Page 16: ...ut forcing it in any way making sure to enter the tabs in their own seats in the head and turn it 90 to the right until it stops without forcing fig d To facilitate the entrance you can moisten slight...

Page 17: ...the cover fig f At the rear of the machine find the inflation valve of the expansion tank fig g With a manometer check that the indicated pressure is 0 1 MPa If necessary restore it with a compressor...

Page 18: ...ogen peroxide at 10 volumes per 10 liters of osmotic water or dose 100 ml of hydrogen peroxide at 24 volumes per 10 liters of osmotic water Insert the sanitizing cartridge s and close the conditioning...

Page 19: ...ected Check the flat connection cable of the display to the board fasten it properly Defective display Replace the display Defective board Replace the board Problem Intervention of the fuse and protec...

Page 20: ...stening of cable that goes to terminals Problem The machine produces little water Cause Solution Clogged solenoid valve Check the input solenoid valve status and operation if it is clogged replace it...

Page 21: ...pment must be delivered to an WEEE waste center CER 20 01 36 WASTE OF ELECTRICAL ELECTRONIC EQUIPMENT UK EU directive 2002 96 EC classifies this product as an electrical or electronic tool Do Not disp...

Page 22: ...UCTIVITY PROBE 2 1 1 1 Scala Scale Denominazione Product name Progettista Designer Verifica Confirm Codice prodotto Product code Applicazione Application N disegno N drawing Esecutivo Executive Sperim...

Page 23: ...7596040 MANUALE WO 20 EN 21052018 REV 1 23 ANNEX III MAINTENANCE LOG INSTALLATION TECHNICIAN DATE SIGNATURE ORDINARY MAINTENANCE TECHNICIAN DATE SIGNATURE...

Page 24: ...7596040 MANUALE WO 20 EN 21052018 REV 1 24...

Reviews: