ENGLISH
SGR10S
Before starting
Chapter 2
Page GB 4
9.696.035
Version 1.02
2.3
Assembly and function
2.4
Sealing process sequence
Step 1
:
After the sterilisation packaging has been inserted the transport
switches on automatically.
Step 2:
The sterilisation packaging is now transported and the sealing seam area is
heated up by the heating dies positioned above and below to the sealing
temperature set.
Step 3
:
The sealing seam, which is now heated up, is pressed through the sealing rolls
and thus sealed.
Step 4
:
The completed sterilisation packaging is transported to the withdrawal side.
Step 5:
If no further material to be sealed is fed in the transport switches off after
approximately 30 seconds.
Power connection
Power switch
Mains fuses
Adjustable
sealing edge setting
Temperature
regulator