
Installation
25
EN
To check the operating pressure of the
appliance it is recommended at least 2
large size burners are used. Ensure
appliance is secured to wall when
installation is completed.
N.G.
The regulator supplied must be fitted
to the ½ BSP thread at the rear of the
appliance. An approved manual shut-off
valve must be installed. The N.G. regulator
must be checked and adjusted to 1.0kPa
after installation.
U.L.P.G.
Can be connected to the inlet
fitting directly. The pressure must be
checked to ensure it is operating at
2.75kPa. A separate test point fitting must
be installed between the piping & the
appliance for the pressure to be checked to
ensure it is operating at 2.75kPa.
Connection to LPG
Use a pressure regulator and make the
connection on the gas cylinder following
the guidelines set out in the regulations in
force.
The supply pressure must comply with the
values indicated in the “Gas types and
Countries” table.