Installation
127
EN
The nozzles not provided are available at Authorised Service Centres
.
7 LPG – G30/G31 30-37 mbar
SR
R
UR2 int.
UR2 ext.
Rated heating capacity (kW)
1.80
3.0
0.90
3.30
Nozzle diameter (1/100 mm)
65
85
44
91
Pre-chamber (printed on nozzle)
-
-
-
-
Reduced flow rate (W)
500
800
400
1300
Rated flow rate G30 (g/h)
131
218
65
240
Rated flow rate G31 (g/h)
129
214
64
236
8 LPG G30/31 - 37 mbar
SR
R
UR2 int.
UR2 ext.
Rated heating capacity (kW)
1.90
3.0
0.80
3.30
Nozzle diameter (1/100 mm)
65
81
42
88
Pre-chamber (printed on nozzle)
-
-
-
-
Reduced flow rate (W)
550
900
450
1500
Rated flow rate G30 (g/h)
138
218
58
240
Rated flow rate G31 (g/h)
136
214
57
236
9 LPG G30/31 - 50 mbar
SR
R
UR2 int.
UR2 ext.
Rated heating capacity (kW)
1.80
3.0
1.0
3.30
Nozzle diameter (1/100 mm)
58
74
43
73
Pre-chamber (printed on nozzle)
M
Z
H2
S1
Reduced flow rate (W)
500
1000
400
1500
Rated flow rate G30 (g/h)
131
218
73
240
Rated flow rate G31 (g/h)
129
214
71
236
10 Town gas G110 – 8 mbar
SR
R
UR2 int.
UR2 ext.
Rated heating capacity (kW)
1.80
2.80
1.0
3.20
Nozzle diameter (1/100 mm)
185
260
145
300
Pre-chamber (printed on nozzle)
/2
/3
0040
0190
Reduced flow rate (W)
500
800
400
1000