Disassembly sequence series 4060
18
UPPER ARM SPRAYER DELIVERY TUBE DISASSEMBLY
Tools required in this disassembly procedure
TOOL No. 1 Phillips slotted screwdriver
TOOL No. 2 Long nose pliers
TOOL No. 3 13mm Open-ended spanner
TOOL No. 6 flat-blade screwdriver
1- Remove the top, secured by means of two
screws on the rear side of the machine (tool no.
1).
2.Now pressing with the hand on the front top (1),
push towards the back of the machine lifting it (2),
to completely remove the component.
1
2