
10
9. UNPACKING
1.
Unpack and check all items against the packing list in Section 7.
2.
Having opened the packing box carefully lift upwards the top section
high density foam module which covers the turntable/ tonearm unit.
Lift out the turntable lifting from under the main chassis (bottom
of turntable). The turntable should be sited on a substantial table
or strong audio stand which must be capable of supporting the
turntable weight.
3.
With the turntable sited lift the left side of the turntable to gain
access to the motor transit screw which secures (clamps) the
motor to the main chassis. Remove the motor transit screw and
position the turntable squarely and centrally onto an audio stand.
Ensure that the motor base posts are securely inserted into the
compliance cups.
4.
The turntable is shipped with only a small quantity of oil in the
bearing housing and this should be filled before setting up the
turntable. A measured quantity of oil is
provided in the syringe and needs to be
injected into the bearing housing.
5. Remove the syringe from its packing
and insert the tip into the oil filler
adaptor, which will be found
factory fitted next to the spindle (as
illustrated).
6. Slowly inject the complete quantity
of oil into the bearing housing
maintaining downward pressure
throughout the operation to prevent
leakage. Remove the syringe and
dispose of it responsibly
7. Unscrew and remove the oil filler
adaptor using the box spanner
found inside the tool kit. Retain the
adaptor for possible future use.
Oil Syringe
Oil Filler Adaptor
Spindle
Summary of Contents for Diamond MK2 Synergy
Page 1: ...INSTRUCTIONS...
Page 19: ...19...