T
WISTED
-P
AIR
D
EVICES
4-3
3. As each connection is made, the Link LED (on the switch)
corresponding to each port will light to indicate that the connection is
valid.
Network Wiring Connections
Today, the punch-down block is an integral part of many of the newer
equipment racks. It is actually part of the patch panel. Instructions for
making connections in the wiring closet with this type of equipment
follows.
1. Attach one end of a patch cable to an available port on the switch, and
the other end to the patch panel.
2. If not already in place, attach one end of a cable segment to the back
of the patch panel where the punch-down block is located, and the
other end to a modular wall outlet.
3. Label the cables to simplify future troubleshooting. See “Cable
Labeling and Connection Records” on page 4-8.
Figure 4-2 Network Wiring Connections
Equipment Rack
(side view)
Switch
Patch Panel
Punch-Down Block
Wall
PWR
Diag
25
26
26
25
Summary of Contents for TigerSwitch SMC6726AL2
Page 2: ......
Page 14: ...COMPLIANCES x ...
Page 20: ...FIGURES xvi ...
Page 28: ...ABOUT THE TIGERSWITCH 10 100 1 8 ...
Page 64: ...SPECIFICATIONS C 4 ...
Page 66: ...ORDERING INFORMATION D 2 ...
Page 72: ...GLOSSARY Glossary 6 ...
Page 76: ...INDEX Index 4 ...
Page 77: ......