Table 8. Port size
.
Preparation before piping.
a) Before piping is connected, it should be thoroughly blown out with air to remove dust and scale from
inside the pipe. Dust and scale on the inlet side of the filter can be removed, but those on the outlet side
cannot be removed, so they can enter the solenoid valve or rotary table, which causes malfunction or
shortens product life.
b) When screwing piping or fittings into ports, ensure that chips from the pipe threads or sealing material
do not enter the piping. Also, if pipe tape is used, leave 1.5 to 2 thread ridges exposed at the end of the
threads.
Air supply
Air supplied to the rotary actuator shall be cleaned by the filter.
CRJ series is lubrication free.
- 25
–
Fig. 5 Wrapping of pipe tape
Sealant tape
Winding
Expose approx. 2 threads
direction
Size
Port size
Front port
Side port
05
M3X0.5
1