![SMC Networks 7824M/VSW Installation Manual Download Page 28](http://html1.mh-extra.com/html/smc-networks/7824m-vsw/7824m-vsw_installation-manual_1300202028.webp)
Installation Manual
IMN
TigerAccess™ EE
SMC7824M/VSW
27
5.1
Connecting Uplink Interface
5.1.1 Installing
Optical
Connection
The switch provides uplink 1-slot which requires its own additional optical module. You
can select the proper module in
Tab. 6.3
. In this section, the case of installing an optical
connection with the LC type SFP module is described.
Use the following procedure when installing the optical connection with the LC type SFP
module.
1. Cut the optical cables with LC connector to length.
2. Attach the LC connectors.
3. Label and mark the cables.
4. Route and stow the cable in the rack.
5. Insert the SFP module into the service slot for optical connection.
6. Install the cables in accordance with your cabling plan.
7. Connect the fiber optic cable to SFP module.
Fig. 5.1
shows how to install SFP module and fiber optic cable.
Fig. 5.1
Installing the Optical Connection with SFP Module