I
NSTALLING
THE
S
WITCH
3-8
5. If you are sure the module is properly mated with the connector,
tighten the retainer screws to secure the module in the slot.
6. To confirm that the module is correctly installed and ready to use,
connect an active device to the module, and verify that the
corresponding port indicator on the switch’s front panel turns green to
show that there is a valid link.
Installing an Optional SFP Transceiver
Figure 3-6 Inserting an SFP Transceiver into a Slot
This switch supports 1000BASE-SX/LX/ZX SFP-compatible
transceivers. To install an SFP transceiver, do the following:
1. Consider network and cabling requirements to select an appropriate
SFP transceiver type.
2. Insert the transceiver with the optical connector facing outward and
the slot connector facing down. Note that SFP transceivers are keyed
so they can only be installed in one orientation.
3. Slide the SFP transceiver into the slot until it clicks into place.
Mgmt
Mgmt
Summary of Contents for 7824M/FSW
Page 2: ......
Page 18: ...TABLE OF CONTENTS xviii E Ordering Information E 1 Glossary Index ...
Page 40: ...NETWORK PLANNING 2 8 ...
Page 58: ...INSTALLING THE SWITCH 3 18 ...
Page 68: ...MAKING NETWORK CONNECTIONS 4 10 ...
Page 72: ...TROUBLESHOOTING A 4 ...
Page 80: ...CABLES B 8 ...
Page 86: ...EXTENDER MODULES C 6 ...
Page 96: ...ORDERING INFORMATION E 2 ...
Page 102: ...GLOSSARY Glossary 6 ...
Page 106: ...INDEX Index 4 ...
Page 107: ......