background image

Technical Information 

 

Carrantuohill 
Page 1 

 

Installation Instructions 

EN 1176-1 

Maintenance Instructions  EN 1176-1 

 
 
 
 
 

10.10.14 

 
 
General 

 

The operations described are to be carried out by a specialist. 

 

The climbing frame is fixed on a galvanised square tubular frame. Concreting is not necessary. It is easy to 
change  the  location  without  the  bases 
having  to  be  removed  or  remaining  in 
the soil.

 

 
 
Dimensions

 

 

 

 

 

Effective space             2.99 x 2.99 m 
Drop 

             1.55 m 

Minimum space      

  6.09 x 6.09 m 

Height 

        2.99 m 

 
Age group 

4 years upwards

 

 

Number of users 

About 15 children

 

 

Maximum free drop height 

1.57 m 
 
 
 
 
 
 

Figure 1          Type Carrantuohill  

 

Ground quality 

 
With regard to the type of ground in the play area, please refer to EN 1176-1. According to this, sand, wood 
chips, gravel and HIC tested synthetic protective coatings are allowed. We recommend a min. 400 mm thick  
layer of gravel (grain size 2 

– 8 mm) or sand (grain size 0.2 - 2 mm). If you use a synthetic protective surface 

it must be sure that all relevant parts for the maintenance (see maintenance instruction on page 4) are every 
time accessibly. If necessary consult SMB. 
 

 

Assembly tools 

 

Tools supplied: 

Additional tools required: 

 

size 32 socket spanner with extension 

size 24 open-jawed spanners 

size 10 Allen key 

electric screwdriver for special bits 

special bits for securing screws 

double ladder, approx. 3 m long  

size 27socket spanner 

normal assembly tools 

 

 

Summary of Contents for Carrantuohill

Page 1: ...arrantuohill Ground quality With regard to the type of ground in the play area please refer to EN 1176 1 According to this sand wood chips gravel and HIC tested synthetic protective coatings are allowed We recommend a min 400 mm thick layer of gravel grain size 2 8 mm or sand grain size 0 2 2 mm If you use a synthetic protective surface it must be sure that all relevant parts for the maintenance s...

Page 2: ...nd square This framework ensures that the frame tubes and the hollow balls can be screwed in correctly 1 Plug in frame Part 1 2 Plug in frame Part 2 3 Plug in frame Part 3 4 Tube anchor Figure 2 Anchoring frame Assembling the frame An approx 3 m long double ladder will be required for assembly The arrangement of the frame tubes and ball joints is shown in figure 3 The reference number printed on t...

Page 3: ...ews provided figure 5 and 6 If individual rope ends should insert only with difficulty you can help yourself with an injection of silicon or oil in the ROWOCON sleeves In no case it is allowed to remove the end sleeve of the rope Then fasten the opposite side using the hemp rope to provi sionally tighten the net which will make threading and screwing down easier The two remaining sides of the net ...

Page 4: ...llution effects of weather The surface netting should be examined for damage especially broken strands The cover locks for the hollow balls should be checked Operational inspection twice yearly The additional element inside netting if fitted should be checked for tautness Retensioning is carried out at the tensioning point by removing the cover and increasing the tension on the tensioning sleeve s...

Reviews: