Fitting netting entry points
The entry ladders (if ordered) should be fitted on the space netting at the press connections marked (if
not already done in the works) and on the middle base on the eye bolts
(Figure B).
Tensioning the netting
Tensioning (tensioning tools are supplied) is carried out with the tube tensioning jacks and should be performed
uniformly and crossways.
Alternating at each turnbuckle in each case a short piece must become strained
till the final initial tension is achieved.
Ensure that the mast is in a vertical position. Apply noticeable
preliminary tension to the rope netting. After tensioning, the lock nut should be securely tightened. Finally,
the safety ropes should be connected to the safety anchor loop via the clevises.
The first re-tensioning of the space netting
!!! Initial re-tensioning should be carried out after one to two weeks of use
(reference operational inspection for more details) !!!
Caution:
When putting the mast up and when
stretching the space network make
sure absolutely that the mast is not
pulled beyond the vertical (figure 3)!
Pull only at the mast, not at the space
net (Figure 3)!
Figure 3